Paralysed builder stranded on floor for six hours after fall

Grant Prior 10 months ago
Share

A builder was left paralysed from the chest down after falling through a ceiling at a housing job in Derbyshire.

Father-of-three Andrew Clifford remained lying face down on the floor for around six hours before he was found by a delivery driver. He judged the time by hearing hourly news bulletins from his radio.

Clifford had been working alone installing first-floor joists during the construction of a house on Main Road in Dronfield. The 51-year-old was carrying out the work on behalf of Paul Freeman Limited – a Mansfield-based company he had worked with for around 20 years.

The HSE has prosecuted the company for failing to properly plan work at height.

On the morning of 31 October 2022 Clifford slipped and fell from the first floor to the ground below and was left unable to move.

He spent nearly five months in hospital, with the injuries to his spinal cord so serious they left him paralysed from the chest down, with only limited movement in his hands and arms.

Clifford said: “The first thing I recall after my fall was landing on my head.

“From that point it was a very strange feeling as from when I landed, I felt no pain and I couldn’t understand why or that I couldn’t get up.

“My radio was on and I judged the time by the news. After an hour, I tried to move again and this carried on for around three hours. Eventually, I realised this was serious and I thought I’d better stay still as I didn’t want to cause further injuries.

“This wasn’t the type of street where people were walking past and as it started to get dark I was getting really worried.

“When I was found by the delivery driver I heard him shout out, ‘hello, hello, hello’.

“I think I fell between 9am and 9.30 and wasn’t found until 3pm.”

He described how being a builder was a job he loved and the impact the incident has had on his everyday life.

Clifford said: “I can’t do anything I used to love doing before.

“Simple things like doing the gardening, washing the car and jobs around the house.

“I can’t even wash or dress myself now.

“I haven’t been upstairs in my house since the accident – my wife and three daughters all sleep upstairs and I sleep alone downstairs.

“Another thing that really upsets me is the thought of not being able to walk my daughters down the aisle when they get married.”

An HSE investigation found that Paul Freeman Limited failed to ensure that work at height had been properly planned and, as such, no measures had been implemented to prevent falls during the construction of the first floor.

Paul Freeman Ltd of Mansfield, Nottinghamshire, pleaded guilty to safety breaches at Derby Magistrates’ Court and were fined £40,000 and ordered to pay costs of £6,263.

HSE inspector Sara Andrews said: “My thoughts remain with Andrew and his family, whose lives have changed dramatically as a result of this preventable incident.

“This case highlights the importance of undertaking a thorough assessment of the risks for all work at height activities and the need to ensure that, where work at height cannot be avoided, suitable control measures are implemented to minimise the risk of serious injury.

“This is even more significant when lone working.”

Latest news

Civils winners revealed for £12bn National Grid high voltage work

Contractor wins complete £59bn investment programme
9 hours ago

United Living quits new-build housing as costs mount

£136m-turnover housing arm to wind down as focus shifts to core infrastructure
12 hours ago

Fight looms for £3bn West Midlands building framework

Galliford Try, Morgan Sindall and others face fight to keep CWM seats
12 hours ago

Industry anger over sudden CITB funding changes

Smaller contractors lose funding route worth £10,000 a year
12 hours ago

Plans in to transform former GSK London HQ with 2,300 homes

Landmark 13-acre scheme set to transform Brentford Great West Road campus
11 hours ago

Watch Murphy near completion of major new rail bridge

Latest video reveals progress on Greek Street bridge during 21-day train suspension
12 hours ago

Mount Anvil’s in-house builder drives results in testing market

Group development pipeline holds steady at 3,384 homes despite dip in profit
13 hours ago

Costain margin heads for 4.5% after half-year profit rise

Roads and HS2 rephasing hit transport revenues but £5.6bn forward book to support growth
1 day ago

Hinkley contractors face prosecution over rebar mesh fall

Bouygues and Laing O'Rourke face action brought by the Office for Nuclear Regulation
2 days ago

Farrans to build new £59m Paisley bridge

Work to start soon on transport project for Renfrewshire Council
2 days ago

Crown Estate hires Olympics village veteran to lead delivery push

John Nicholson to oversee £16bn portfolio’s major UK development pipeline.
1 day ago

Henry Boot gets green light for 2,500 new homes

Hallam Land division sees signs planning system is speeding-up
2 days ago

Wates inks £100m deal on first new-design prison houseblocks

HMP Onley expansion leads roll-out of new standardised design
2 days ago

£122m deal to unlock Newcastle’s last brownfield site

Land remediation funding paves way for 2,500-home Forth Yards neighbourhood
2 days ago

McLaren lands Heathrow logistics deal

1.6 hectare airport site to be transformed into modern warehouses
3 days ago

McAlpine veteran to lead T&T’s project management drive

Former Olympic Stadium lead Mike O’Donnell takes lead role with focus on major capital project delivery
2 days ago

IES snaps up Nexus Power out of administration

Utilities group strengthens expertise in 400kV jointing and offshore markets
3 days ago

Thames Water tenders £120m water main rehab deal

Company seeks 2–5 contractors for London and South East renewal works
2 days ago

Lower Thames Crossing to lead green planning reforms

New system to avoid another £100m HS2 bat tunnel
2 days ago

Mace lands latest 30-storey City of London tower

85 Gracechurch Street near Leadenhall Market to be transformed
4 days ago

Vinci gets go-ahead for £250m Stockport 8 scheme

Contractor to start first phase of 435 net zero homes next year
3 days ago

£80m bid race to convert Oxford Debenhams into labs

Crown Estate advance plan to convert former six storey department store
3 days ago

Bennett steps-in to finish Guinness Covent Garden brewery

Original fit-out contractor Beck Interiors fell into administration
4 days ago

Work-to-rule set to hit Sellafield clean-up

Action by 1,500 construction workers across 34 contractors
3 days ago

Aureos breaks ground on £45m Howden Relief Road

Yorkshire road will pave way for 2,000-home scheme
3 days ago

Oxford United win green light for £150m all-electric stadium

Planners back 16,000-seat Kidlington ground with hotel, plaza and community hub
7 days ago

Demolition record as eight cooling towers come down

Watch Brown & Mason set record at Cottam Power Station
1 week ago

Hitachi Energy named for EGL3 converter station deal

Firm to build major HVDC converter stations in Aberdeenshire and West Norfolk
7 days ago

PAS NW secures landmark £20m civils deal in Lancashire

Groundworks firm wins infrastructure for 429-home Wain Homes scheme
6 days ago

Subcontractors wanted for jobs across the South West

Register now for latest Constructionline event in Bristol
6 days ago