Worker crushed to death on tunnel job

Grant Prior 9 years ago
Share

Yorkshire’s National Coal Mining Museum Trust and two companies have been ordered to pay a total of £590,000 in fines and costs after a worker was crushed and killed at the museum in 2011.

Father-of-two Michael Buckingham, 58, of Grimethorpe, near Barnsley, died after he became trapped between a tunnel construction machine and a dumper loader that he was operating.

The fatal incident, on 25 January 2011, happened 138 metres below ground at the museum’s site at Caphouse colliery in Wakefield.

Sheffield Crown Court heard that Buckingham, an experienced miner and electrician, was part of a team engaged in the second phase of a £2.7m improvement project.

This involved constructing 140 metres of new tunnels to revitalise the visitors’ tour and increase the number of exhibition galleries.

At the time, the museum trust had hired specialist contractor Amalgamated Construction Ltd (AMCO), of Barnsley, to build the tunnels.

AMCO, which employed Buckingham, was using the two machines, both supplied by Metal Innovations Ltd (MIL), of Cowbridge in Wales.

Buckingham sustained fatal crush injuries when he became trapped between the tunnel construction machine and the forward-tipping dumper – a mineral carrying machine – that he had been operating.

Counsel for HSE, Rex Tedd QC, told the court that HSE identified that the dumper:

•  did not have a readily-accessible emergency stop function;

•  did not meet essential safety requirements relating to the design and supply or machinery; and

• posed a clearly foreseeable risk that it would entrap the operator.

He said equipment supplier MIL was responsible for failing to supply equipment that met the essential health and safety requirements required of all new machinery.

The contractor, AMCO, had failed to carry out a suitable risk assessment of the machine or the work activities, including the interactions of the workers and equipment; and had put an unsafe machine to work, exposing staff to substantial risk.

The court was told that the Museum Trust’s safety breach centred on its failing to ensure that the mine was run in accordance with all relevant safety regulations.

Unlike those of the other two defendants, the breach had not played a causative role in the loss of Buckingham’s life.

Amalgamated Construction Ltd, of Barnsley, South Yorkshire, was fined a total of £110,000 with £245,000 to pay in costs after pleading guilty to safety breaches.

Metal Innovations Ltd, of Cowbridge, Wales, was fined £80,000 with £110,000 in costs after admitting a safety breach.

The museum trust was fined £10,000 with £35,000 in costs to pay after admitting breaching the Management and Administration of Safety and Health at Mines Regulations 1993.

Following the sentencing, Buckingham’s widow, Gail, said: “Mick was a hard-working, loving husband and family man who will always be missed. Although we are satisfied with the outcome, we would have liked responsibility to have been accepted a long time ago.”

HSE Principal Inspector for Mines Paul Bradley said: “There were several factors that came into play that led to the very tragic death of a much-loved and respected family man.

“It was an incident that could have been prevented but all three parties had a role to play in how it went badly wrong.

“It was clearly foreseeable that entrapment and crushing could result from the use of this mobile machinery, given how the work was being carried out.

“This meant Mr Buckingham had to walk backwards on occasions and operate close to other equipment within the confines of an underground roadway. Low-cost solutions could have addressed these hazards and such solutions were readily available.

“The MIL-supplied forward tipping dumper did not conform to design standards or safety requirements, and the dumper’s canopy both reduced the potential for escape from the incident and caused severe injuries to Mr Buckingham.

“Other equipment supplied or used by AMCO and Metal Innovations had integral emergency stop facilities within easy reach.

“It was also clear from the investigation that Mr Buckingham had not benefited from suitable and sufficient training in the use of the dumper.

“Machines and equipment must be supplied free from defects and accord with safety provisions. They must be assessed in the work environment and a system of work devised for their safe use.”

 

Latest news

Carpenter killed by falling timber frame panels

Court fines specialist contractor £8,000 after site tragedy
2 days ago

Road sweeper specialist files administration notice

Go Plant lodges court notice
2 days ago

Anglian Homes rides in to finish crashed Everest contracts

Rival doubled glazed window specialist commits to complete orders
2 days ago

Final work starts to connect super sewer to London system

End in sight with 1.5m thick concrete wall to be demolished to link-up to Lee Tunnel sewer system
2 days ago

Legal challenge launched against £1.5bn A66 dualling

Balfour Beatty, Kier and Keltbray must now await outcome of court challenge
2 days ago

John F Hunt wins 24-storey Battersea tower

Specialist to carry-out demolition, enabling works and RC frame construction
3 days ago

William Hare wins steelwork on £500m Broadgate towers

Specialist to work on 2 Finsbury Avenue with McAlpine
3 days ago

McAlpine appoints MD to grow ventures business

Owain Thomas will build on private rental and healthcare development successes
3 days ago

BAM Co-op Live Arena opening delayed yet again

Another gig cancelled last night amid last minute safety concerns
3 days ago

National Grid unveils winners for £9bn network upgrade

New 'enterprise model' to deliver infrastructure schemes quicker and cheaper
4 days ago

Turkish insulation panel maker to build £45m UK factory

Assan Panel to open first UK plant at Freeport East
3 days ago

Expanding consultant Stantec swoops for Hydrock

Stantec UK business expands by a third as 950 staff join from Bristol-based engineer
4 days ago

Contractors wanted for £800m highways deal

Bids invited for Eastern Highways Alliance Framework 4
3 days ago

Galliford Try names group head of infrastructure

David Lowery promoted to Divisional Managing Director – Infrastructure.
3 days ago

Chigwell Group looks at stock market listing

Essex contractor registers as Public Limited Company
4 days ago

A57 Mottram Bypass clears final legal challenge

Balfour Beatty to get go-ahead to start shortly
4 days ago

100 jobs axed as Geoffrey Osborne confirms administration

Chairman Andrew Osborne calls it a 'sad day' as board loses fight for survival
5 days ago

Midgard set for Notting Hill office tower overhaul

Landmark project edges towards final approval after 10-year planning saga
4 days ago

Cumbrian civils firm clinches £40m Sellafield contract

Civils specialist Stobbarts will support McAlpine on groundworks and concrete
4 days ago

Designers named for London 2000-bed student rooms job

Bouygues will build £400m London School of Economics student scheme next to Tate Modern
4 days ago

£117m-turnover contractor files administration notice

ARJ Construction lodges court notice
5 days ago

£1bn London Blackfriars tower blocks approved

Trio of buildings rising to 45, 40 and 22 storeys approved by Southwark Council
5 days ago

Council decides to end Balfour deal after 13 years

Contractor has been maintaining roads across Herefordshire since 2013
5 days ago

Six civils clients to switch to low carbon concrete and steel

National Highways, Northumbrian Water and Sellafield sign fresh decarbonising pledge
6 days ago

Fortem extends homes repair deal across Birmingham

Willmott Dixon owned firm adds another two years to deal worth £170m
5 days ago

Kier wins £118m civil service Darlington hub

Work is expected to start towards the end of this year
6 days ago

Green light for 34-storey Digbeth apartments tower

480 flats will be delivered for Clarion housing association
5 days ago

LHC starts race for major retrofit and decarb framework

Hunt starts for firms to help with 6.1m social homes upgrade target
6 days ago

Windows giant Everest crashes into administration

Around 350 jobs at risk while hunt starts for a buyer to salvage business
6 days ago

Green light for £500m Newcastle health complex

Mixed use scheme will promote healthy living across all stages of life
6 days ago

Contractor services