16-year build plan for £2bn HS2 Euston Station

Aaron Morby 10 years ago
Share

Fresh plans to rebuild Euston station for HS2 and unlock a major above ground regeneration site will be submitted to Parliament next week.

Eleven new platforms for HS2 will be built at the station in two stages as part of a phased approach that means less disruption for passengers.

The new blueprint includes more space for homes, offices, shops and restaurants, and staging construction work over 16 years from 2017 instead of nine to ease disruption.

The extra costs would be within the overall HS2 budget of £42bn.

The plans, which will now be considered by Parliament, also offer the flexibility to transform the station into a thriving transport and community hub.

Underpinning support structures as part of the plans will allow a range of uses above the station, allowing for wider redevelopment and regeneration of the area.

As well as the 11 high speed platforms provided by the new plan, 11 platforms will remain in the current station to serve the existing network. There will be new public spaces for shops, restaurants and cafes.

Euston Station HS2 Eiston Station HS2 Euston Station plan

Two-stage plan

  • Construction of six new high speed platforms and concourse to the west of the station to support the opening of HS2 Phase One (between London and the Midlands) high speed services in 2026
  • Construction of five further high speed platforms and concourse to support the opening of Phase Two (between London and Leeds/Manchester) high speed services in 2033

The plan allows for potential redevelopment of the remaining existing station platforms and concourses, subject to future funding and approvals.

A staged approach to building the high speed terminus means existing services can continue to operate.

London Underground facilities at Euston will also be significantly enhanced with passengers benefitting from greater space and connections to services including a new ticket hall and direct subway to Euston Square station. Access to taxis, buses and cycles will also be greatly improved.

Simon Kirby, HS2 chief executive, said: “These firm proposals will allow Euston to fulfil its potential.

“Just a stone’s throw away, we have seen how the stations at King’s Cross and St. Pancras have transformed the surrounding areas into vibrant and thriving locations.

“We must replicate and build on that commercial and architectural success. Now is the time for Euston to catch up with its neighbours to meet the requirements of the 21st century and beyond.”

The plans are proposed for inclusion in the High Speed Rail (London-West Midlands) Bill by means of an Additional Provision, which is due, subject to the approval of Parliament, to be deposited on Thursday 17 September.

Transport Secretary Patrick McLoughlin said: “HS2 offers a once in a lifetime opportunity to revolutionise not just Euston station but a whole area at the heart of London. The new station will be the catalyst for wider redevelopment and so it is right that we are ambitious in our plans to dramatically improve the design, capacity and technology used.”

Latest news

Ex-Lendlease boss seals £24bn Crown Estate mega sites JV

JV targets mega sites build out at Euston, Thamesmead and Smithfield
53 minutes ago

McLaren to build 2,400-bed worker campus at Sizewell C

Worker camp to raise the bar on site accommodation standards
38 minutes ago

Soaring costs and work drought sunk historic scaffolding firm

Rodells had been in business since 1898
41 minutes ago

Clarion set to tender £79m Kirkstall Road Phase 2

Bidding to start for Dyecoats blocks 1 and 3 after Graham bagged phase 1
1 hour ago

TfL seeks firms for £700m civils and station framework

Works include £80m South Kensington and £60m Elephant & Castle station upgrades
2 hours ago

Early market talks on £2.5bn Yorkshire mass transit plan

Supplier talks open for West Yorkshire’s biggest ever transport scheme
45 minutes ago

Robertson starts Redcar town centre revamp

Culture and Leisure Anchor Attraction will enhance Redcar’s Esplanade
1 hour ago

Alun Griffiths set to rescue firm he sold for £36m

Tarmac to hand back Welsh civils contractor after five years of losses
3 days ago

Landsec to pump £2bn into new house building drive

Developer to build 6,000 homes as it sells offices to fund new schemes
3 days ago

Severfield to start steel on McAlpine car battery site

Specialist to start on £4bn site next month after steel package signed-off
3 days ago

Construction Manager of the Year crowned

Jason Hunt of Willmott Dixon wins for work on Bristol concert hall
3 days ago

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
4 days ago

Vital Energi lands £250m Gatwick decarbonisation deal

Five-year programme to switch airport away from gas heating
3 days ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
4 days ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
4 days ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
4 days ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
4 days ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
5 days ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
5 days ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
4 days ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
5 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
6 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
5 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
5 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
5 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
5 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
6 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
7 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
6 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
6 days ago

Contractor services