Power company Scottish & Southern Electricity has lost its legal claim for £130m against contractor Hochtief following the collapse of a section of major tunnel at the Glendoe hydroelectric scheme.

Glendoe hydroelectric scheme above Loch Ness required Hochtief to bore 5 miles of tunnel
Glendoe hydroelectric scheme above Loch Ness required Hochtief to bore 5 miles of tunnel

SSE launched legal action to cover the cost of bringing BAM Nuttall in to repair the water tunnel after a bust-up with Hochtief over who would pay for the remedial work.

Hochtief signed a £126m contract back in December 2005 after beating rival bidder Morgan Est to secure the major TBM rock tunnelling project.

The Glendoe hydroelectric scheme above Loch Ness was the biggest one to be built in Scotland for many years and consisted of boring a total of 5 miles of tunnel the diameter of the London Tube.

Hochtief handed over the scheme at the end of 2008 gaining a £2m bonus for achieving early completion, allowing the scheme to begin operating in January 2009.

Seven months later, however, it ceased to generate electricity. SSE discovered that rock material had fallen into the tunnel over several months, leading to an almost complete blockage.

SSE was losing substantial amounts of revenue while the scheme was out of commission. But after four month haggling with Hochtief about who should pay for the works, called in BAM Nuttall.

Remedial works took much longer and cost far more than expected. The scheme did not begin to generate electricity again until August 2012.

Glendoe

The tunnel section that collapsed lay in a geological area known as the Conagleann Fault Zone

SSE sought to recover the £130m costs involved in the remedial works from Hochtief in the Scottish Court of Session. SSE relied on various provisions in the contract to try and establish liability.

In its defence Hochtief contended that it had completed the works in accordance with the contract, and that SSE had assumed the risk of the collapse at takeover.

Lord Woolman said that the collapse had occurred in a part of the tunnel that lay in a geological area known as the Conagleann Fault Zone.

All the engineering geologists had known about the CFZ before construction began. They expected to find poor rock conditions there. In fact they found none. As a result they saw no reason to reinforce the tunnel perimeter in that section. The collapse was caused by insufficient support.

Having heard the evidence from several tunnelling experts, Lord Woolman said: “I am satisfied that Hochtief did exercise reasonable skill and care. SSE’s case depends on the accumulation and interpretation of all the data that has been obtained since the collapse. Put short, it is founded on hindsight.”

He decided that Hochtief was not liable.

Lord Woolman said that the parties had agreed £1m as the ceiling figure for the lost income incurred by SSE, and that he was minded to award that sum. Lord Woolman also said that the cost of the recovery project was in the main reasonable.

A spokesman for the energy company said: “SSE is disappointed with the ruling by the Court of Session on the compensation claim relating to repair work at our Glendoe hydro scheme near Fort Augustus in the Highlands. We will review the decision in more detail and assess our options.”

Latest news

Kier upgrades margin target as order book holds firm

Contractor eyes 4.5% margin as bid discipline pays off
2 minutes ago

Drylining giant takes bold step on accepting design risk

Siniat liability pledge designed to stop risk being pushed down supply chain
20 minutes ago

Section 106 agreements now taking an average of 16 months

Planning departments cannot cope with workloads leading to more house building delays
4 minutes ago

Winvic starts £200m Towcester Park logistics scheme

IM Properties presses ahead with 1.1m sq ft Midlands logistics park
10 hours ago

Safety regulatory drag takes toll on Getjar turnover

Revenue slumps 42% as firm adapts to slower resi job starts
16 hours ago

Erith seals early works for £300m London City Road tower

Demolition to start this summer for landmark Old Street roundabout job
16 hours ago

Galliford gets sign-off to start Wigan Galleries job

Fettlers scheme starts with £44m market hall and basement build
21 hours ago

Manchester Nobu tower back on track after noise row settled

Planning committee backs 76-storey tower again after extra sound tests
24 hours ago

Kier lands £21m deal for Worcester sewage works upgrade

AMP8 boost as firm moves into build phase of Severn Trent project
1 day ago

£125m Sevenoaks regeneration plan advances

Firm wanted to replace leisure centre and deliver homes at High Street site
1 day ago

Subcontractors wanted across east of England

Marketplace Live event in Cambridge: Register now
24 hours ago

Extra £1.5bn of funding agreed for armed forces housing

Defence Review also promises construction of six munitions factories
2 days ago

Thames Water seeks tunnelling contractors

Bidding launched for £242m Teddington drought resilience scheme
4 days ago

UK’s biggest data centre plan breaks cover in Lincolnshire

Plans submitted for £7.6bn AI hyperscale build near Scunthorpe
4 days ago

Government seizes control to fast-track £5bn reservoir plan

Ministers bypass local planners for Lincolnshire and Fens reservoir projects
4 days ago

London council unveils £150m housing estate revamp plan

Hackney gears up to deliver 341 infill homes at De Beauvoir estate
4 days ago

Worker injured during prep work at Persimmon site

Houlihan & Co worker airlifted to hospital
5 days ago

Morrisroe sales slide 15% but group edges back into profit

Turnover hit by safety regulator brake on new high rise resi projects
5 days ago

First platforms installed at HS2 Old Oak Common station

Balfour Beatty VINCI SYSTRA starts station fit-out work: Video
4 days ago

Murphy hikes profit 25% to £84m as orders smash £5.4bn

Order book jumps by nearly two-thirds as firm extends global reach
5 days ago

Cladding specialist EAG files administration notice

Sister firm of failed contractor Alucraft lodges court notice
5 days ago

John Lewis wins battle to build four resi towers above store

Ardmore in frame for landmark £240m Ealing towers plan above new Waitrose
5 days ago

Restructure pays-off for HG Construction

Turnover down but profit up as Building Safety Act delays schemes
5 days ago

Mace confirmed for £100m Natural History Museum job

Construction to start imminently at Thames Valley site
6 days ago

McAleer & Rushe starts £90m Birmingham student rooms job

Selly Oak project will transform derelict supermarket site
6 days ago

20 firms win £577m public estate maintenance framework

Procurement Assist signs off four-year framework for cyclical works
5 days ago

Cubby in talks over rescue restructure after civils job setback

Carlisle contractor hit by Carlisle Southern Link Road losses
6 days ago

Rayner rips up rules to get small builders building

Wildlife habitat rules and building safety levy dropped on sites up to 49 homes
6 days ago

Cladding costs recovery helps Willmott Dixon return to profit

Contractor claimed back £20m from third parties last year
6 days ago

£35m Hereford Western Bypass job to go to tender

Phase 1 tender set for September with design element included
6 days ago

Contractor services