Contractors to start South Shields transport revamp

Aaron Morby 8 years ago
Share

Contractors are being mobilised to start key projects in the £100m planned revamp of South Shields.

Two key transport projects will get underway in the next few months after the Government allocated cash to Nexus , which is responsible for running the Tyne and Wear Metro service.

Bowmer & Kirkland is starting demolition of the town’s former Post Office and Royal Mail building to pave the way for a spring start on a £20m transport interchange in the heart of the town.

The project will create a new bus interchange as well as a relocated and refurbished Metro Station.

Nexus has also picked Galliford Try to build an £8.4m training centre that will be used to train around 1,000 contractors and staff who work on the North East’s Metro system.

Designed by architect Stephen George and Partners, work will also start on the new centre in April and be completed in early 2019.

Design for three-storey Metro maintenance and renewals skills centre

The new centre will house a Metro driver training simulator and include a 70m stretch of dual track to carry out rail infrastructure training.

The skills centre would be built around existing Metro sidings, between Mile End Road and Salem Street in South Shields, on the site of the town’s original railway station, which was closed as the Metro line was built in the early 1980s.

Both projects arise from a partnership between South Tyneside Council and Muse Developments to transform South Shields town centre.

The South Shields 365 vision will mean improvements are made to all aspects of community life – from shopping and leisure to the way people travel to, from and around the town centre.

This second phase of redevelopment will build upon Bowmer & Kirkland’s previous project to build the £17m Word library and digital media centre.

David Wells, Regional Director at Muse Developments, said: “The demolitions are a major step to clear the way for the construction of the transport interchange – it’s a complex project for which the background work has been going on for many months so it’s great to see the construction phase now getting closer.

“The end result will be a superb and modern public transport facility that will benefit both local residents and visitors alike.”

Planning permission was granted last year for the transport interchange, as well as outline planning permission for Phase three, new retail and leisure development.

Councillor Iain Malcolm, Leader of South Tyneside Council, said: “Phase Two of our masterplan is gathering pace and people will start to see physical changes happening around the town now.

 

 

Latest project news

Plans in for nearly 900 homes at Manchester Mayfield

First homes at £1.4bn regeneration site will be built over four blocks
2 months ago

Pellikaan wins £25m Wiltshire leisure centre job

Work to start next month on Trowbridge swimming pool and gym
2 months ago

Lendlease OK’d to start Birmingham’s £1.9bn Smithfield scheme

First phase of 400 build to rent homes at Manor Square approved
3 months ago

Fresh plan for £170m Newcastle resi tower and hotel

Gainford Group scales down New Bridge Street scheme to 29 storeys
3 months ago

Mace confirmed for £140m Gatwick Airport Pier 6 extension

Contractor PJ Hegarty has started enabling works in middle of busy airport
3 months ago

Graham takes on ISG £45m Coventry cultural hub job

Firm will start conversion work in the Spring on former IKEA store
3 months ago

JRL Malaysian backers plan £150m London city office refurb

Ardmore set to deliver landmark 25 Finsbury Circus building overhaul
3 months ago

500-home block to replace 19 storey Sutton office tower

Landmark project to deliver 312 Build to rent and 195 co-living homes
3 months ago

Man Utd confirm plan for £2bn ‘super-tent’ stadium

Club to press ahead with 100,000-seat 'Wembley of the North'
3 months ago

Morgan Sindall wins £61m Liverpool lab scheme

Construction to start this Autumn on latest Knowledge Quarter project
3 months ago

Glencar to build timber-framed office block

Work to start next month on 79,200 sq ft scheme in Maidenhead
3 months ago

Birmingham council submits £1bn Druids Heath plan

High rise estate to be replaced by-3,500 home eco village
3 months ago

McLaren go-ahead for 314 flats Watford scheme

Police station and magistrates court to be demolished
3 months ago

Mace to transform Imperial College Great Hall

Work to start next month on ambitious refit
3 months ago

£100m plan to regenerate former Digbeth ironworks

Hartwell unveils 260,000 sq ft office and 240 homs plan
3 months ago

Legendre UK wins £21m London homes job for Clarion

Tower Hamlets building to be replaced due to building and fire safety issues
3 months ago

£230m Southampton waterfront scheme approved

Town Quay includes trio of 25 storey towers around new marina
3 months ago

Planning green light for £10bn Northumberland data centre

Blackstone-backed project will create 1,200 construction jobs
3 months ago

Green light for 1,000-home Wolverhampton city centre regen

Phase one of ECF Smithgate scheme to start this year
3 months ago

Regal submits plan to revive stalled London resi tower

Swiss Cottage project redesigned with second staircase and 237 flats
3 months ago

Muse signs up to £3.2bn Solihull health campus district

Ambitious Arden Cross scheme next to HS2 Interchange advances
3 months ago

Watkin Jones wins over £50m student digs campus upgrade

Work to start next month on phase 714-bed south London campus
3 months ago

Costain start date for £67m Romford flyover replacement

Work to start this summer on Gallows Corner bridge rebuild
3 months ago

Work starts on tyres to jet fuel recycling plant

£100m Sunderland plant will produce around 30,000t of liquid fuel
3 months ago

Funding deal for £237m Tide Construction student tower

48-storey project will be first major student scheme on Canary Wharf
3 months ago

McLaren wins £29m south east London industrial job

Crayford urban logistics hub starts construction
3 months ago

Green light for £100m A47 road junction upgrade

Long-awaited A47/A11 Thickthorn junction will support over 40,000 homes
3 months ago

Sisk starts remediation work for 1,600-home Birkenhead scheme

Wirral council has secured £52m for Hind Street Urban Village infrastructure
3 months ago

Plans unveiled for 50-storey plus Liverpool tower

Planning submission later this year for £1bn King Edward project
3 months ago

Galliford Try wins £45m high security prison fire safety retrofit

HMP Wakefield provides upgrade challenges in secure environments
3 months ago

Contractor services