Lord Foster unveils £50bn Thames estuary airport

Aaron Morby 14 years ago
Share

Details of bold plans to build a four-runway airport in the Thames estuary have been formally unveiled.

Architect Lord Foster and consultant Halcrow produced the self-funded designs for the Thames Hub, which it has been estimated could cost more than £50bn to build.

Nothing of this scale has ever been proposed in the UK as a single scheme to this level of detail.

The grandiose plans link important rail freight connections between the country’s main sea ports with a new 150m passenger airport in the Thames estuary and a big tidal energy and flood protection barrage.

Lord Foster believes the estuary airport should be located on the Hoo Peninsula, 55km from London, which can be reached in 30 minutes by high-speed rail.

He said: “We need to recapture the foresight and political courage of our 19th century forebears if we are to establish a modern transport and energy infrastructure in Britain for this century and beyond.

“If we don’t then we are denying future generations to come. We are rolling over and saying we are no longer competitive – and this is a competitive world. So I do not believe we have a choice.”

“If the UK is to remain globally competitive, these proposals need to be seriously considered.”


Airport project offers chance to reawaken UK’s global ambition, says Lord Foster

Halcrow group board director, David Kerr, said: “Great challenges require bold solutions, which is why I believe our Thames Hub vision is critical to society and to the country’s economic prosperity. If we don’t sustain and invest in infrastructure, then it’s at our peril.

“If the UK is to remain globally competitive, these proposals need to be seriously considered.”


New giant terminal is designed to handle 150m passengers a year

A much-needed new Thames Barrier would be integrated into the airport plan

A new four-track, high-speed passenger and freight Orbital Rail route around London to link to the rest of the country

The long-term vision, which spans the next 50 years into 2060 builds on the significant development of the Mayor of London’s call for a new airport in the Estuary, while developing the capacity across all of the UK’s transport modes and trade routes.

Its backers argue the ambitious plans will deliver lasting social, environmental and economic benefits and improve the lives of the 5m people living below the Heathrow flight path.

    Thames Hub components

  • New barrier crossing offering flood protection to London and the Thames Gateway into the 22nd century. It would harnesses tidal power to generate carbon-free energy
  • Four-track, high-speed passenger and freight Orbital Rail route around London linking London’s radial lines, HS1 and HS2 and European networks
  • Estuary Airport enabling the UK to retain its global aviation hub status.
  • New utilities and data spine running through the Thames barrier, orbital rail line and high-speed networks
  • Environmental management strategy to create significant new wildlife habitats to more than offset losses elsewhere. The project would reduce pressure on shore habitats from rising sea levels and storm activity

Latest news

TSL turnover smashes £500m as profit almost trebles

Data centre and logistics contractor rises high on surging demand
31 minutes ago

Laing O’Rourke tops June contracts league

£919m animal super lab dominates new orders
2 hours ago

Gleeson Homes chief exec leaves business after restructure

Management revamp after "challenging" year
58 minutes ago

Green light for 1,600-home Oldham town centre overhaul

Plans for over 1,600 homes across six regeneration sites approved
1 hour ago

DSM wins Norwich city centre clearance job

Anglia Square shopping centre clearance for £300m scheme
1 hour ago

13-year-old becomes UK’s youngest qualified digger driver

Grandson of Gallagher Group chairman sets industry record
10 hours ago

Cubby reborn in £12m Svella-backed takeover

£50m revenue target set as 14 firms combine under new Cubby Group banner
1 day ago

North East NHS trusts plot £3bn health estate overhaul

Market engagement begins for major construction push across four trusts
1 day ago

HG goes green on cranes in £1.2m switch to battery power

Diesel-free crane drive cuts fuel bills by 94%
1 day ago

Developer fined £165,000 for fire safety failings

Firm ignored fire safety orders on apartment job in Preston
1 day ago

Bidding to start for £1.8bn North West framework

Contractors invited to bid for latest Procure Partnerships deal
1 day ago

Hill hits record £90m profit as homes pipeline swells

Build-to-rent push and £4.8bn contracting book to fuel next growth phase
2 days ago

Rayner unveils £39bn plan to build 300,000 social homes

Council building revival and rent reform feature in social and affordable homes plan
2 days ago

Keltbray bounces back with £3.2m profit

Tighter controls and smarter project selection fuel strong turnaround
2 days ago

VINCI JV wins 500-home twin town centre revamps

Chester Northgate phase 2 and Northwich Weaver Square schemes move to delivery stage
2 days ago

80 energy projects unlocked as Ofgem backs grid expansion

£24bn energy networks deal gets green light from regulator
3 days ago

How to see your stories on the Enquirer

Join our Suppliers and Buyers directory to get your news published
2 days ago

Henley lands Midland Mill revamp on Leeds tower scheme

Restoration of 18th-century mill kicks off on South Bank regeneration project
2 days ago

New boss at Eric Wright Civil Engineering

Gavin Hulme takes top job as Diane Bourne moves to group role
2 days ago

Pinewood submits £1bn data centre plan

Studio giant adds green and learning spaces to tech hub blueprint
3 days ago

Record results after TClarke goes private

Britain's biggest M&E contractor flourishes after de-listing
3 days ago

Dalkia lands £200m nuclear maintenance deal

1,000 nuclear FM staff to join M&E contractor
3 days ago

Construction comeback to outpace wider economy

Arcadis forecast fueled by spending review optimism
4 days ago

First steel goes up on giant car battery site

Severfield gets to work on McAlpine Somerset site
4 days ago

Permasteelisa wins cladding deal on Bovis city tower

Facade specialist lands package at 60 Gracechurch Street
3 days ago

Fox buys recycled asphalt specialist Fisher

Acquisition adds major recycled asphalt capacity in north west
4 days ago

Major Building Safety Regulator shake-up to end tower delays

HSE stripped of control and top fire chiefs brought in to fast-track stalled schemes
4 days ago

Hinkley trio sign Sizewell civils deal

Balfour,Bouygues and Laing O'Rourke form Civil Works Alliance for new power station
4 days ago

£3.9bn data centre plan for Ravenscraig steelworks

Green energy to power massive new steel to silicon AI campus
4 days ago

Breakthrough on HS2’s second longest tunnel

8.4 mile Northolt to Old Oak Common drive completes
4 days ago