HS2 unveils plans for “people mover” on new viaduct

Grant Prior 6 years ago
Share

HS2 has unveiled plans for a driver-less “people mover”connecting the new Interchange Station in Solihull with Birmingham Airport.

The 2.3km route will also have stops at Birmingham International Station, and the National Exhibition Centre.

Passengers on the six-minute trip will travel on a viaduct for the entire route which will be 12 metres off the ground at its highest point.

When fully operational, the people mover will carry up to 2,100 passengers per hour in each direction.

Mark Thurston, CEO of HS2 Ltd, said: “HS2 is about connecting the country, and the people mover is another example of how we will do that.

“This entire area in the West Midlands, and the wider regions across the UK will be able to capitalise on the connectivity that Birmingham Interchange Station brings and the people mover is an integral part of this.

“The high speed connection into Interchange Station opens up the UK Central Hub, the NEC, Birmingham International station and Birmingham Airport to new business and leisure customers who might not have chosen this area previously.

“With the airport being only six minutes from the station, it means better options for air travellers, and makes it more accessible to even more of the UK.”

HS2 is currently working to finalise the scheme design of the people mover before submitting a planning application to Solihull Metropolitan Borough Council.

Latest news

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
2 hours ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
38 minutes ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
10 hours ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
9 hours ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
8 hours ago

Bowmer + Kirkland to build £190m Oxford science scheme

Work to start at end of next month on 180,000 sq ft Fabrica scheme
16 hours ago

New BAM leisure centre pool springs a leak

Contractor investigating "technical issues" delaying new £36m green leisure centre
1 day ago

United Living lands £250m HyNet pipeline deal

Firm wins deal to design and build over 34km of pipework to collect CO2
16 hours ago

Hydrogen diggers get green light to use roads

JCB hails historic decision for advance of hydrogen-fuelled plant on sites
17 hours ago

Go-ahead for McAleer & Rushe Glasgow student job

£100m funding deal paves way for 591-bed student tower
17 hours ago

Fly-tippers to get their vehicles crushed

Drones will be used to identify cowboy construction waste operators
17 hours ago

Green light for £150m West End office revamp

Shaftesbury Avenue office retrofit retains 75% of original building
2 days ago

Morgan Sindall lands £20m Brunswick Wharf scheme in Bideford

North Devon waterside project will provide 100 flats
1 day ago

Former Keltbray managers jailed after corruption trial

Jail sentences following bribery probe on jobs including Battersea Power Station
2 days ago

Lidl pumps £500m into store and logistics expansion

Discounter plans 40 new stores this year as expansion ramps up
2 days ago

JJ Rhatigan UK profit jumps as turnover tops £150m

Irish contractor's expansion in England gathers pace
2 days ago

Driverless digger to be used on Taylor Woodrow site

Autonomous excavator to work at Manchester Airport after successful trial
2 days ago

MCS Build lands Basingstoke warehouse scheme

Construction starts this month after £26m funding deal
2 days ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
2 days ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
3 days ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
3 days ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
3 days ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
3 days ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
3 days ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
3 days ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
3 days ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
6 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
7 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
6 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
6 days ago

Contractor services