Track maintenance crash reveals design flaws in rail kit

Grant Prior 5 years ago
Share

Rail investigators have highlighted “alarming weaknesses” in maintenance equipment design after a track crash left a worker with life-changing injuries.

The converted ballast distributor
The converted ballast distributor

The Rail Accident Investigation Branch has released its report into the incident on the line between Chester and Crewe in the early hours of September 19 2018.

A road-rail ballast distributor travelling in reverse on the line collided with a small personnel carrying vehicle.

Two track workers who were in the rear of the personnel carrier were injured, one of them suffering life changing leg and back injuries.

Investigators found the adapted ballast track offered very limited visibility when driven in reverse.

Simon French, Chief Inspector of Rail Accidents said: “Driving a truck loaded with ten tonnes of stones backwards for several miles along the road is not something most people would contemplate doing.

“When that truck has been converted for use on the railway, the driver no longer has to worry about steering it – but being able to see where you are going is just as vital.

“This sad accident, in which a member of railway staff suffered life-changing injuries, has revealed some alarming weaknesses in the design of railway equipment and the railway’s working processes.

“The machine that ran into a stationary personnel carrier was a road lorry that had been converted so that it could be used on both road and rail.

“On the railway, turning round is not easy to do and so it would have to travel significant distances in reverse.

“However, the driver’s seating and controls had not been altered, so when the machine was going backwards, the driver had to turn round in their seat, to see where they were going.

“The load of ballast carried by the lorry obstructed any view directly along the track.

“The RAIB’s investigation found that there had been inadequate consideration of the practical aspects of using such a machine on the railway.

“To comply with the rules, the machine would have to travel at walking pace, accompanied by someone walking alongside the track (usually in the dark), who would be at risk from all the tripping and slipping hazards of the modern lineside.

“This could mean taking hours to reach the site of work, wasting much of the time available for track maintenance at night. In this case, the crew ran backwards at an average speed of between 11 and 15 miles an hour, in the belief that there was nothing in the way.

“The RAIB is recommending that the industry takes effective action to ensure that its road-rail vehicles can be driven safely to and from the site of work, now and in the future.”

Latest news

Carpenter killed by falling timber frame panels

Court fines specialist contractor £8,000 after site tragedy
20 hours ago

Road sweeper specialist files administration notice

Go Plant lodges court notice
1 day ago

Anglian Homes rides in to finish crashed Everest contracts

Rival doubled glazed window specialist commits to complete orders
1 day ago

Final work starts to connect super sewer to London system

End in sight with 1.5m thick concrete wall to be demolished to link-up to Lee Tunnel sewer system
1 day ago

Legal challenge launched against £1.5bn A66 dualling

Balfour Beatty, Kier and Keltbray must now await outcome of court challenge
1 day ago

John F Hunt wins 24-storey Battersea tower

Specialist to carry-out demolition, enabling works and RC frame construction
2 days ago

William Hare wins steelwork on £500m Broadgate towers

Specialist to work on 2 Finsbury Avenue with McAlpine
2 days ago

McAlpine appoints MD to grow ventures business

Owain Thomas will build on private rental and healthcare development successes
2 days ago

BAM Co-op Live Arena opening delayed yet again

Another gig cancelled last night amid last minute safety concerns
2 days ago

National Grid unveils winners for £9bn network upgrade

New 'enterprise model' to deliver infrastructure schemes quicker and cheaper
3 days ago

Turkish insulation panel maker to build £45m UK factory

Assan Panel to open first UK plant at Freeport East
2 days ago

Expanding consultant Stantec swoops for Hydrock

Stantec UK business expands by a third as 950 staff join from Bristol-based engineer
3 days ago

Contractors wanted for £800m highways deal

Bids invited for Eastern Highways Alliance Framework 4
2 days ago

Galliford Try names group head of infrastructure

David Lowery promoted to Divisional Managing Director – Infrastructure.
2 days ago

Chigwell Group looks at stock market listing

Essex contractor registers as Public Limited Company
3 days ago

A57 Mottram Bypass clears final legal challenge

Balfour Beatty to get go-ahead to start shortly
3 days ago

100 jobs axed as Geoffrey Osborne confirms administration

Chairman Andrew Osborne calls it a 'sad day' as board loses fight for survival
4 days ago

Midgard set for Notting Hill office tower overhaul

Landmark project edges towards final approval after 10-year planning saga
3 days ago

Cumbrian civils firm clinches £40m Sellafield contract

Civils specialist Stobbarts will support McAlpine on groundworks and concrete
3 days ago

Designers named for London 2000-bed student rooms job

Bouygues will build £400m London School of Economics student scheme next to Tate Modern
3 days ago

£117m-turnover contractor files administration notice

ARJ Construction lodges court notice
4 days ago

£1bn London Blackfriars tower blocks approved

Trio of buildings rising to 45, 40 and 22 storeys approved by Southwark Council
4 days ago

Council decides to end Balfour deal after 13 years

Contractor has been maintaining roads across Herefordshire since 2013
4 days ago

Six civils clients to switch to low carbon concrete and steel

National Highways, Northumbrian Water and Sellafield sign fresh decarbonising pledge
5 days ago

Fortem extends homes repair deal across Birmingham

Willmott Dixon owned firm adds another two years to deal worth £170m
4 days ago

Kier wins £118m civil service Darlington hub

Work is expected to start towards the end of this year
5 days ago

Green light for 34-storey Digbeth apartments tower

480 flats will be delivered for Clarion housing association
4 days ago

LHC starts race for major retrofit and decarb framework

Hunt starts for firms to help with 6.1m social homes upgrade target
5 days ago

Windows giant Everest crashes into administration

Around 350 jobs at risk while hunt starts for a buyer to salvage business
5 days ago

Green light for £500m Newcastle health complex

Mixed use scheme will promote healthy living across all stages of life
5 days ago

Contractor services