Smart motorways to get more emergency refuge areas

Aaron Morby 5 years ago
Share

The Government reveal plan to improve safety on the nation’s smart motorways, including building more emergency refuge areas and making them more visible

New-look emergency refuge areas
New-look emergency refuge areas

Transport Secretary Grant Shapps announced the conclusion of the Government safety review today, which will see 18 new measures introduced at a cost of several hundreds of millions of pounds.

The move will lift the moratorium of Smart motorway building, which stalled two north west schemes that were ready to start.

These include Galliford Try’s £90m M56 job near Manchester Airport and Costain’s £150m M6 contract between Warrington and Wigan.

Among the fresh measures for smart motorways, the Government is considering a national programme to install more emergency areas where places to stop are more than one mile apart.

Highways England will be instructed to reduce the distance between places to stop in an emergency to 3/4 of a mile where feasible so that on future schemes motorists should typically reach one every 45 seconds at 60mph.

On the M25, an additional 10 ERAs are to be introduced on sections of smart motorway with a higher rate of live lane stops and where places to stop in an emergency are furthest apart.

The initial smart motorways pilot project set ERAs at 600m but when the programme began to be rolled out refuges were placed up 2.5 miles apart.

Shapps said: “The overall evidence shows that in most ways smart motorways are as safe or safer than conventional ones. But they are not in every way.

“Therefore, I am launching an extended package of measures – an action plan – to raise the bar on smart motorway safety.”

He said that the Government would abolish confusing “dynamic hard shoulder” smart motorways, where the hard shoulder operates only part-time and is a live running lane the rest of the time.

Highways England will also accelerate its plans and install “stopped vehicle detection” technology within the next 36 months.

ERAs are also to be made more visible with a bright orange road surface and dotted lines on the surfacing to show where to stop.

There will also be better and more frequent signs on approach and signs inside giving information on what to do in an emergency.

These will be installed by the end of spring 2020.

 

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
2 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
2 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
3 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
2 days ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
2 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
2 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
2 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
3 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
2 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
3 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
4 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
3 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
3 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
3 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
3 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
3 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
4 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
4 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
4 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
4 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
5 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
4 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
4 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
5 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
5 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
6 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
5 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
5 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
5 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services