Bellway recladding costs overshadow hit from Covid

Aaron Morby 5 years ago
Share

House builder Bellway this morning revealed it has set aside £47m to cover post-Grenfell recladding and other fire remediation works on its buildings.

The figure overshadows the direct impact costs of the Covid pandemic, estimated at nearly £26m, from non-productive site costs during lockdown and impacts from several aborted land deals.

Even taking into account further added costs of £19m arising from extended site durations and extra social distancing measures, the impact was less than the expected cost of retrofitting properties to meet more stringent Government safety requirements.

This morning, the house builder reported pre-tax profit in the year to July had slumped by almost two-thirds to £237m.

The number of housing completions fell by 31% to 7,522 from last year’s total of 10,892.

After a difficult second half, Bellway said it was seeing strong forward sales for the year ahead and forecast completions to rebound to around 9,000 by summer 2021.

Productivity is back to 85%-95% of pre-Covid levels, with the firm hoping for further improvements from future material price negotiations and talks with subcontractors.

Chief executive Jason Honeyman said: ” In the first nine weeks of the new financial year, trading has been robust, with overall average weekly reservations rising by 30.6% to 239 per week (1 August to 29 September 2019 – 183 per week).

“Pent-up demand arising from the prolonged period of lockdown inactivity, together with Government support through the stamp duty holiday and provision of Help-to-Buy, have contributed to this reassuringly strong performance.”

As a result of this positive start, the order book at the start of October was up 42% to £1,87bn, comprising 6,624 homes (2019 – 5,190 homes).

Latest news

Sisk swoops to buy Farrans from CRH

625-strong Northern Ireland based business to continue trading under own brand
60 minutes ago

Keepmoat to deliver 600-home urban village in Sandwell

Big decontamination job needed to unlock one of region’s largest brownfield sites
2 hours ago

Graham to start £71m enabling works at Liverpool Central Docks

Work to pave the way for Peel Waters’ 2,350-home waterfront neighbourhood
5 hours ago

Bouygues to build LSE’s 2,000-bed London Bankside towers

LSE plans to replace Bankside House with trio of towers up to 28 storeys
7 hours ago

Lack of sewerage blocking building work on 30,000 homes

House builders blast planning delays over inadequate wastewater infrastructure
7 hours ago

Race starts for £145m River Dee Bridge rebuild

Welsh Government sets 2026 start date for major cross-border link
7 hours ago

Canary Wharf to submit plan for Olympic-sized lido

Plan to deliver six-lane natural water pool at Eden Dock by 2026
7 hours ago

Plans go in for six-tower Leeds resi scheme

New £100m "urban community" for 3.7acre site
8 hours ago

Genuit buys ventilation firm Monodraught for £56m

Building products giant acquires £17m turnover business
7 hours ago

Ardmore Construction Ltd falls into administration

Move isolates fire safety claims, leaving main Ardmore group free to grow profitability
3 days ago

Aston Villa gets go-ahead for £100m North Stand expansion

Project to modernise 1897-built ground ahead of EURO 2028
3 days ago

Quartet wins £1.75bn Midlands Rail Hub upgrade deal

VolkerRail, Laing O’Rourke, AtkinsRéalis and Siemens team up on Birmingham upgrade
4 days ago

McLaren confirmed for £250m Cardiff arena

Robertson Property secures planning green light for 16,500-capacity venue
4 days ago

John F Hunt starts work on £150m West End office revamp

Six month strip out deal at 125 Shaftesbury Avenue
3 days ago

Former Skanska vice president to join Galliford Try

Thomas Faulkner to head up specialist services division
3 days ago

Bowmer + Kirkland snaps up office fit-out firm Denton

Acquisition gives £40m turnover interiors specialist firepower to chase bigger jobs
4 days ago

Contractors sought for £667m Welsh Water mega project

Utility tests appetite for design, build and finance for twin water treatment jobs
4 days ago

Worker killed on Mace London site

Fatal accident on major site in Brent
5 days ago

Willmott Dixon veteran takes construction COO role

Former trainee Stewart Brundell promoted after nearly 40 years at the firm
5 days ago

BSR delays dent margins at OHOB despite record sales

Turnover up 18% to £369m as pre-tax profit nudges £22m
4 days ago

Plans go in for 30-storey Preston tower

£40m scheme will be tallest residential building in Lancashire
4 days ago

Former Laing O’Rourke leader to join Skanska

James Davies to oversee key defence and health projects
4 days ago

Green light for £10bn data hub prep works in Northumberland

Enabling works to roll out over 16 months on former Blyth Power Station site
6 days ago

VolkerWessels UK profits jump as rail and marine work surges

Infrastructure contractor posts £48m pre-tax profit and stronger order book
6 days ago

Groundworks boss wins payout over gagging order

Subcontractor raised fears over asbestos on housing sites
5 days ago

B+K to start £50m rebuild of Northumberland school

Cramlington Learning Village redevelopment contract signed off
6 days ago

New Homes Accelerator targets six new major sites

Construction to be sped-up on another 12,000 homes
5 days ago

Network Rail spend down as CP7 shift bites contractors

Firms warn of inflation squeeze and reprofiled workbanks
6 days ago

Wall of six towers planned for North London strip site

Hendon Goods Yard site plan for line of resi blocks rising to 29 storeys
6 days ago

SCF opens door to single stage tenders for first time

Gen-6 Southern Construction Framework to widen scope for smaller jobs
6 days ago