30 win £800m energy efficiency framework

Aaron Morby 5 years ago
Share

More than 30 renewable energy, heating and insulation firms have won places on a new £800m energy efficiency framework for the public sector.

The Energy Efficiency Measures and Associated Works framework from procurement experts LHC allows local authorities, social landlords and other public bodies to source specialist suppliers who can install a variety of carbon-cutting improvement measures.

It can be used to deliver new and retrofit works on homes and public buildings.

The framework is worth up to £500m in England, £200m in Scotland and £100m in Wales.

Energy Efficiency Measures and Associated Works partners


  • A C Whyte (Scotland)
  • Aaron Services
  • Absolute Solar & Wind
  • AD Construction Group (Architectural Decorators)
  • AES
  • Alisa Building
  • Amaresco
  • Aran Services
  • BCA Insulation (Scotland)
  • Breyer Group
  • British Gas Social Housing
  • CCG Scotland (Scotland)
  • Crystal Electronics
  • Custom Solar
  • E.On (Midlands)
  • Easy Heat Systems
  • Engie
  • Everwarm
  • Gibson Specialist (Wales)
  • Insulated Render Systems (Scotland)
  • Ivor Cook
  • K&T Heating
  • Kensa
  • Lawtech
  • Low Carbon Exchange
  • Mi-Space
  • MP Group U K
  • SERS Energy Solutions (Scotland)
  • Sure Maintenance
  • Sustainable Building Services (UK)
  • Swarco UK
  • Synergize
  • The Casey Group
  • Thermal Earth (Wales)
  • United Living (South)
  • Zing Energy

The regional lots cover the procurement of 21 individual energy efficiency measures across the UK as well as providing a multi-disciplinary offer.

Mij Rahman, director of procurement at LHC, said: “This framework provides contracting authorities with an easier route to procure a variety of new and emerging energy efficiency technologies along with low-carbon retrofit services.

“There is huge interest and demand in the public sector for this work, but many councils and social housing providers need guidance and support with such technically-led procurement demands.

“To implement their decarbonisation plans, public authorities can take advantage of professional support, through technical and practical guidance available through the N8 framework contractors, and could also seek consultancy support from LHC’s Energy Efficiency Consultancy framework.”

The N8 framework covers: external, internal and cavity wall insulation; biomass heating systems; solar PV with battery storage; air to water heat pumps; electric vehicle charging infrastructure; solar thermal systems; building energy management systems; ground source heat pumps; commercial boilers; and electric heaters.

 

Latest news

Sisk swoops to buy Farrans from CRH

625-strong Northern Ireland based business to continue trading under own brand
30 minutes ago

Keepmoat to deliver 600-home urban village in Sandwell

Big decontamination job needed to unlock one of region’s largest brownfield sites
4 hours ago

Graham to start £71m enabling works at Liverpool Central Docks

Work to pave the way for Peel Waters’ 2,350-home waterfront neighbourhood
6 hours ago

Bouygues to build LSE’s 2,000-bed London Bankside towers

LSE plans to replace Bankside House with trio of towers up to 28 storeys
8 hours ago

Lack of sewerage blocking building work on 30,000 homes

House builders blast planning delays over inadequate wastewater infrastructure
9 hours ago

Race starts for £145m River Dee Bridge rebuild

Welsh Government sets 2026 start date for major cross-border link
9 hours ago

Canary Wharf to submit plan for Olympic-sized lido

Plan to deliver six-lane natural water pool at Eden Dock by 2026
9 hours ago

Plans go in for six-tower Leeds resi scheme

New £100m "urban community" for 3.7acre site
9 hours ago

Genuit buys ventilation firm Monodraught for £56m

Building products giant acquires £17m turnover business
8 hours ago

Ardmore Construction Ltd falls into administration

Move isolates fire safety claims, leaving main Ardmore group free to grow profitability
3 days ago

Aston Villa gets go-ahead for £100m North Stand expansion

Project to modernise 1897-built ground ahead of EURO 2028
3 days ago

Quartet wins £1.75bn Midlands Rail Hub upgrade deal

VolkerRail, Laing O’Rourke, AtkinsRéalis and Siemens team up on Birmingham upgrade
4 days ago

McLaren confirmed for £250m Cardiff arena

Robertson Property secures planning green light for 16,500-capacity venue
4 days ago

John F Hunt starts work on £150m West End office revamp

Six month strip out deal at 125 Shaftesbury Avenue
3 days ago

Former Skanska vice president to join Galliford Try

Thomas Faulkner to head up specialist services division
3 days ago

Bowmer + Kirkland snaps up office fit-out firm Denton

Acquisition gives £40m turnover interiors specialist firepower to chase bigger jobs
4 days ago

Contractors sought for £667m Welsh Water mega project

Utility tests appetite for design, build and finance for twin water treatment jobs
4 days ago

Worker killed on Mace London site

Fatal accident on major site in Brent
5 days ago

Willmott Dixon veteran takes construction COO role

Former trainee Stewart Brundell promoted after nearly 40 years at the firm
5 days ago

BSR delays dent margins at OHOB despite record sales

Turnover up 18% to £369m as pre-tax profit nudges £22m
4 days ago

Plans go in for 30-storey Preston tower

£40m scheme will be tallest residential building in Lancashire
4 days ago

Former Laing O’Rourke leader to join Skanska

James Davies to oversee key defence and health projects
4 days ago

Green light for £10bn data hub prep works in Northumberland

Enabling works to roll out over 16 months on former Blyth Power Station site
6 days ago

VolkerWessels UK profits jump as rail and marine work surges

Infrastructure contractor posts £48m pre-tax profit and stronger order book
6 days ago

Groundworks boss wins payout over gagging order

Subcontractor raised fears over asbestos on housing sites
5 days ago

B+K to start £50m rebuild of Northumberland school

Cramlington Learning Village redevelopment contract signed off
6 days ago

New Homes Accelerator targets six new major sites

Construction to be sped-up on another 12,000 homes
5 days ago

Network Rail spend down as CP7 shift bites contractors

Firms warn of inflation squeeze and reprofiled workbanks
6 days ago

Wall of six towers planned for North London strip site

Hendon Goods Yard site plan for line of resi blocks rising to 29 storeys
6 days ago

SCF opens door to single stage tenders for first time

Gen-6 Southern Construction Framework to widen scope for smaller jobs
6 days ago