Plan for major Leeds high-rise student and events scheme

Aaron Morby 3 years ago
Share

Developer Downing will submit ambitious plans in the autumn for a major student accommodation and events scheme in Leeds city centre, adjacent to the Leeds First Direct Arena.

New buildings will be clustered around the Leeds Arena building
New buildings will be clustered around the Leeds Arena building

It will seek detailed planning consent for purpose-built student accommodation across two separate but adjacent plots, and outline planning to develop a multi-purpose events space, which would be taken forward at a future date by Leeds City Council.

A 38-storey purpose-built student tower is planned for Merrion Way featuring 728 student bedrooms in a mix of six-bedroom and 296 studios.

High-rise building proposed for site fronting Clay Pit Lane, Merrion Way and Brunswick Terrace, with nearby events centre plan still at outline stage

Meanwhile, the existing Yorkshire Bank office building would be demolished to make way for the second phase, comprising a stepped building rising to 18 storeys, featuring 543 student bedrooms in a mix of five and six-bedroom clusters and 216 studios.

Second student accommodation building proposal for site located between Clay Pit Lane and Elmwood Close

If approved, the plans will pave the way for 1,200 flats and the creation of a 110,000 sq ft facility including an 800-900 capacity auditorium at the centre of the Leeds Arena Quarter, designed to attract additional corporate, cultural and live events.

The sustainable development will incorporate photovoltaic panels and air source heat pumps.

Each element of the plan promises to regenerate unused space in part of the city that will benefit economically from additional footfall. The proposals also have the potential to create approximately 390 jobs in the construction phase.

George Tyson, projects director at Downing, said: “It has long been recognised that Leeds is in need of an additional, flexible events space capable of hosting corporate banqueting, awards ceremonies and live entertainment. With 2,000 square metre flat floor space, this scheme has the potential to host conferences and exhibitions which can’t be facilitated at the Arena or other venues in the city centre, allowing Leeds to secure business that may otherwise be lost to other cities and regions.”

He added: “Attracting and retaining graduate talent is vital to the health of the regional economy and this relies on being able to offer attractive student accommodation. Our proposals will provide students with brand new, first-class living space in a dynamic part of the city, with fast access to university buildings and facilities.”

 

 

 

Latest news

Expanding consultant Stantec swoops for Hydrock

Stantec UK business expands by a third as 950 staff join from Bristol-based engineer
7 hours ago

National Grid unveils winners for £9bn network upgrade

New 'enterprise model' to deliver infrastructure schemes quicker and cheaper
8 hours ago

Chigwell Group looks at stock market listing

Essex contractor registers as Public Limited Company
15 hours ago

A57 Mottram Bypass clears final legal challenge

Balfour Beatty to get go-ahead to start shortly
15 hours ago

100 jobs axed as Geoffrey Osborne confirms administration

Chairman Andrew Osborne calls it a 'sad day' as board loses fight for survival
1 day ago

Midgard set for Notting Hill office tower overhaul

Landmark project edges towards final approval after 10-year planning saga
15 hours ago

Cumbrian civils firm clinches £40m Sellafield contract

Civils specialist Stobbarts will support McAlpine on groundworks and concrete
14 hours ago

Designers named for London 2000-bed student rooms job

Bouygues will build £400m London School of Economics student scheme next to Tate Modern
14 hours ago

£117m-turnover contractor files administration notice

ARJ Construction lodges court notice
2 days ago

£1bn London Blackfriars tower blocks approved

Trio of buildings rising to 45, 40 and 22 storeys approved by Southwark Council
2 days ago

Council decides to end Balfour deal after 13 years

Contractor has been maintaining roads across Herefordshire since 2013
2 days ago

Six civils clients to switch to low carbon concrete and steel

National Highways, Northumbrian Water and Sellafield sign fresh decarbonising pledge
2 days ago

Fortem extends homes repair deal across Birmingham

Willmott Dixon owned firm adds another two years to deal worth £170m
2 days ago

Kier wins £118m civil service Darlington hub

Work is expected to start towards the end of this year
2 days ago

Green light for 34-storey Digbeth apartments tower

480 flats will be delivered for Clarion housing association
2 days ago

LHC starts race for major retrofit and decarb framework

Hunt starts for firms to help with 6.1m social homes upgrade target
3 days ago

Windows giant Everest crashes into administration

Around 350 jobs at risk while hunt starts for a buyer to salvage business
3 days ago

Green light for £500m Newcastle health complex

Mixed use scheme will promote healthy living across all stages of life
3 days ago

Olympian Homes gets go-ahead for Bristol’s tallest building

Work on student and co-living towers to start this summer
3 days ago

ISG gets nod to start £20m Glamorgan school job

Ysgol y Deri specialist needs school is to built at Cosmeston, near Penarth
3 days ago

Walker Modular lands £5m bathroom pod contract

Specialist to work with Graham and Watkin Jones on major build-to-rent scheme

Banned building boss jailed for fraud

Court hears how disqualified director siphoned off cash from new housing company
3 days ago

Osborne staff start looking for new jobs

"Open to Work" flags appear on LinkedIn profiles
6 days ago

Plan rejected for 42-storey tower above historic building

Councillor describes as ludicrous plan to build 300 flats above Georgian mansion
6 days ago

Ventilation deal could hike product prices for contractors

Watchdogs at CMA launch probe after duct firm acquires rival
6 days ago

Tide gets go-ahead for London 412 student flats scheme

Volumetric developer secures planning for West Ealing project
6 days ago

Green light for £75m Friar Gate Goods Yard in Derby

Construction set to start this summer on revamp of historic buildings
6 days ago

Robertson to deliver £45m Newcastle NHS Trust works

Capital works will be focused on Freeman Hospital and the Royal Victoria Infirmary sites
6 days ago

Winners named for £2bn Healthy Homes framework

CHIC reveals line-up of over 40 firms for net zero and building safety works
6 days ago

Plan lodged for tallest skyscraper outside London

Developer Salboy submits plan for 76-storey Manchester resi tower
7 days ago

Contractor services