£1.7bn Blue Eden project refloats Swansea tidal energy plan

Aaron Morby 3 years ago
Share

A £1.7bn project placing Wales at the forefront of renewable energy innovation has been revealed by an international consortium.

The ambitious project proposed for Swansea’s waterfront refloats stalled tidal lagoon renewable energy plans, featuring underwater turbines generating 320 megawatts from a 9.5km structure.

Blue Eden will be sited along an extensive area of land and water, south of the Prince of Wales Dock

It will also feature 1,500 waterfront homes as well as 150 floating homes in the bay, a major floating solar array and major battery storage facility.

The revived lagoon plan is part of the larger proposed Blue Eden project that’s being led by Bridgend-based DST Innovations and a number of business partners, with support from Swansea Council and Associated British Ports.

Made possible by funding from the private sector, the innovative and economy-boosting Blue Eden will be delivered in three phases over 12 years.

Blue Eden project


  • A 60,000 sq m manufacturing plant to make high-tech batteries for renewable energy storage
  • A battery facility to store the renewable energy produced at Blue Eden and power the site. If constructed now, it would be the world’s largest facility of its kind
  • A 72,000 sq  m floating solar array anchored in the Queen’s dock area
  • A 94,000 sq m data centre storing, processing and providing network capabilities for the critical services
  • An oceanic and climate change research centre
  • Floating dome structures that will become cultural and scientific centres to be enjoyed by all
  • Residential waterfront homes for 5,000 people
  • Around 150 floating, highly energy-efficient eco-homes anchored in the water

All the project’s buildings and facilities, including the eco-homes, will be situated alongside the lagoon.

Renewable energy produced on site will power the entire Blue Eden development, including businesses and homes.

Due to the innovation on-site, each home will have up to 20 years’ renewable energy and heat provision included with the sale of the properties.

Tony Miles, Co-founder and Chief Executive of DST Innovations, said: “Blue Eden is an opportunity to create a template for the world to follow – utilising renewable energy and maximising new technologies and thinking to develop not only a place to live and work, but also to thrive.”

The project has been developed following discussions based on a vision put forward by a regional task force led by Swansea Council.

Cllr Rob Stewart, Swansea Council Leader, said: “Blue Eden will put Swansea and Wales at the cutting-edge of global renewable energy innovation, helping create thousands of well-paid jobs, significantly cut our carbon footprint and further raise Swansea’s profile across the world as a place to invest.

“I’m delighted that an international consortium led by a Welsh company has developed our Dragon Energy Island vision into a ground-breaking project that delivers so many benefits and builds on the council’s ambition to become a net zero city by 2050.

“This project truly is a game-changer for Swansea, its economy and renewable energy in the UK, and crucially it can be delivered without the need for government subsidies.”

Andrew Harston, Director of Wales and Short Sea Ports for ABP, said: “We are engaged in discussions around the Blue Eden project which could deliver renewable energy, new homes and skilled jobs. This innovative prototype has the potential to be a first for the UK and bring Britain closer to our net zero target.”

Subject to planning consent, Blue Eden work on site could start by early 2023.

 

Latest news

Osborne staff start looking for new jobs

"Open to Work" flags appear on LinkedIn profiles
23 hours ago

Plan rejected for 42-storey tower above historic building

Councillor describes as ludicrous plan to build 300 flats above Georgian mansion
24 hours ago

Ventilation deal could hike product prices for contractors

Watchdogs at CMA launch probe after duct firm acquires rival
24 hours ago

Tide gets go-ahead for London 412 student flats scheme

Volumetric developer secures planning for West Ealing project
23 hours ago

Green light for £75m Friar Gate Goods Yard in Derby

Construction set to start this summer on revamp of historic buildings
23 hours ago

Robertson to deliver £45m Newcastle NHS Trust works

Capital works will be focused on Freeman Hospital and the Royal Victoria Infirmary sites
23 hours ago

Winners named for £2bn Healthy Homes framework

CHIC reveals line-up of over 40 firms for net zero and building safety works
24 hours ago

Plan lodged for tallest skyscraper outside London

Developer Salboy submits plan for 76-storey Manchester resi tower
2 days ago

Curo starts £170m race for new homes framework

Bath housing association plans to build up to 300 homes a year
2 days ago

Gove approves major Cambridge North mixed-use scheme

Government backs controversial scheme of 424 flats and 600,000 sq ft of tech and lab space
2 days ago

Pontins holiday park to house Sizewell C builders

Suffolk holiday park to house 500 nuclear construction workers
2 days ago

Adrian Bloor targets 1,000 homes-a-year

Expansion plans after major investment into challenger house building business HarperCrewe
2 days ago

Housing firm fined £528,000 after cable strike

Maintenance workers given no information on underground services
2 days ago

Berkeley subbies face six weeks without payments

Introduction of new finance software means payment hiatus for suppliers
3 days ago

Pagabo reveals 56 winners of latest £1.6bn retrofit deal

Decarbonisation Solutions Framework launched: Full list of winners
3 days ago

Go-ahead for £100m Liverpool Love Lane flats

500-flat scheme will be built across four blocks in Vauxhall area of city
3 days ago

Unions win HS2 site access battle at Old Oak Common job

Skanska, Costain, Strabag JV now the last denying unions access to HS2 sites
3 days ago

Contractors jack 1,100t viaduct into place in 13-hour operation

158m-long composite deck structure jacked into place 10-hours ahead of schedule
3 days ago

Wates wins former Daily Mail printworks transformation

British Land advances major cultural venue at London’s Canada Water
4 days ago

Mace poaches Ramboll chief to be Head of Engineering

Martin Feakes will develop civil and structural engineering offer at Mace
4 days ago

Subcontractors form alliance for major civils jobs

Trio of specialists join forces to collaborate and offer Tier 1 contractors a turnkey solution
4 days ago

Fear of supply chain failures boosting collaboration

Procurement survey also reveals project bank account use is rising
4 days ago

Wates sets up business to target 160,000 mouldy social homes

Healthy Homes service will be offered to social landlords across England
4 days ago

Higgins wins £75m Peabody Passive House job

Latest phase of Deptford Landings to start construction
4 days ago

Contractors and unions agree Sizewell C working deal

New deal offers improved sick pay and parental leave over Hinkley Point deal
4 days ago

Competition chiefs win legal fight for more construction raids

High Court rules CMA officials can raid a domestic property as part of investigation
5 days ago

More Osborne companies file administration notices

Three more divisions lodge notices with court
5 days ago

McLaren wins multi-storey urban logistics contract

South London win with British Land is pioneering urban logistics hub
5 days ago

Big social housing schemes at risk over funding uncertainty

Housing associations warn uncertainty over public funding beyond 2026 is curbing new schemes
5 days ago

Kier wins Worcestershire town centre renewal

Firm secures Bromsgrove commercial and cultural hub project
5 days ago

Contractor services