Pioneering vaulted thin shell floor cuts concrete by 75%

Aaron Morby 4 years ago
Share

UK engineers have developed a new vaulted-style, thin-shell concrete floor that uses 75% less material than a traditional flat slab floor.

Full-scale 4.5m x 4.5m thin-shell building erected at Cambridge University’s civil engineering department.
Full-scale 4.5m x 4.5m thin-shell building erected at Cambridge University’s civil engineering department.

The innovative design is being trumpeted as a major advance in the industry’s effort to reduce its carbon footprint.

An interdisciplinary team of structural engineers, mathematicians and manufacturing experts from the Universities of Bath, Cambridge and Dundee has unveiled a full-scale demonstration of a thin-shell floor, which uses 60% less carbon in its construction than the standard flat slab design carrying the same load.

 

The curved vault-shaped structure is covered by standard raised floor panels to create a level surface.

Created by the UKRI-funded ACORN – Automating Concrete Construction – research project, the innovative floor design takes advantage of concrete’s inherent natural properties and strengths.

Dr Paul Shepherd, a Reader in Bath’s Department of Architecture & Civil Engineering and the principal investigator for ACORN, said: “Since concrete is the world’s most widely consumed material after water, and its production contributes more than 7% of global CO2emissions, the easiest way for construction to begin its journey to net-zero is to use less concrete.

“That has been the driving force behind this project, which we hope could make a major difference to the impact of construction.”

The ACORN team has in parallel developed an automated adaptable mould and a robotic concrete spraying system that can be used in off-site factory production.

Alongside this new style of fabrication, the team has also developed bespoke software to optimise floors for a given building design.

The prototype floor design is split into nine transportable pieces with a connection system to join the pieces together.

Reversible joints allow the floor to be disassembled and reused elsewhere at the end of the building’s life, promoting a circular economy for the construction industry.

Dr Shepherd said “After three years of research it is amazing to see the fruits of all our hard work. I just hope that one day soon this type of low-carbon automatically manufactured building becomes so widespread that people walk by without noticing.”

Adam Locke, programme leader of the Europe Hub Technology & Innovation at Laing O’Rourke, one of the ACORN partners, added: “The ACORN Demonstrator is a very useful stepping-stone in the progressive pathway to decarbonizing our solutions and compliments very well our own work in this area.”

 

Latest news

Civils winners revealed for £12bn National Grid high voltage work

Contractor wins complete £59bn investment programme
10 hours ago

United Living quits new-build housing as costs mount

£136m-turnover housing arm to wind down as focus shifts to core infrastructure
13 hours ago

Fight looms for £3bn West Midlands building framework

Galliford Try, Morgan Sindall and others face fight to keep CWM seats
14 hours ago

Industry anger over sudden CITB funding changes

Smaller contractors lose funding route worth £10,000 a year
14 hours ago

Plans in to transform former GSK London HQ with 2,300 homes

Landmark 13-acre scheme set to transform Brentford Great West Road campus
13 hours ago

Watch Murphy near completion of major new rail bridge

Latest video reveals progress on Greek Street bridge during 21-day train suspension
13 hours ago

Mount Anvil’s in-house builder drives results in testing market

Group development pipeline holds steady at 3,384 homes despite dip in profit
15 hours ago

Costain margin heads for 4.5% after half-year profit rise

Roads and HS2 rephasing hit transport revenues but £5.6bn forward book to support growth
2 days ago

Hinkley contractors face prosecution over rebar mesh fall

Bouygues and Laing O'Rourke face action brought by the Office for Nuclear Regulation
2 days ago

Farrans to build new £59m Paisley bridge

Work to start soon on transport project for Renfrewshire Council
2 days ago

Crown Estate hires Olympics village veteran to lead delivery push

John Nicholson to oversee £16bn portfolio’s major UK development pipeline.
2 days ago

Henry Boot gets green light for 2,500 new homes

Hallam Land division sees signs planning system is speeding-up
2 days ago

Wates inks £100m deal on first new-design prison houseblocks

HMP Onley expansion leads roll-out of new standardised design
3 days ago

£122m deal to unlock Newcastle’s last brownfield site

Land remediation funding paves way for 2,500-home Forth Yards neighbourhood
3 days ago

McLaren lands Heathrow logistics deal

1.6 hectare airport site to be transformed into modern warehouses
3 days ago

McAlpine veteran to lead T&T’s project management drive

Former Olympic Stadium lead Mike O’Donnell takes lead role with focus on major capital project delivery
3 days ago

IES snaps up Nexus Power out of administration

Utilities group strengthens expertise in 400kV jointing and offshore markets
3 days ago

Thames Water tenders £120m water main rehab deal

Company seeks 2–5 contractors for London and South East renewal works
3 days ago

Lower Thames Crossing to lead green planning reforms

New system to avoid another £100m HS2 bat tunnel
3 days ago

Mace lands latest 30-storey City of London tower

85 Gracechurch Street near Leadenhall Market to be transformed
4 days ago

Vinci gets go-ahead for £250m Stockport 8 scheme

Contractor to start first phase of 435 net zero homes next year
4 days ago

£80m bid race to convert Oxford Debenhams into labs

Crown Estate advance plan to convert former six storey department store
4 days ago

Bennett steps-in to finish Guinness Covent Garden brewery

Original fit-out contractor Beck Interiors fell into administration
4 days ago

Work-to-rule set to hit Sellafield clean-up

Action by 1,500 construction workers across 34 contractors
4 days ago

Aureos breaks ground on £45m Howden Relief Road

Yorkshire road will pave way for 2,000-home scheme
4 days ago

Oxford United win green light for £150m all-electric stadium

Planners back 16,000-seat Kidlington ground with hotel, plaza and community hub
7 days ago

Demolition record as eight cooling towers come down

Watch Brown & Mason set record at Cottam Power Station
1 week ago

Hitachi Energy named for EGL3 converter station deal

Firm to build major HVDC converter stations in Aberdeenshire and West Norfolk
7 days ago

PAS NW secures landmark £20m civils deal in Lancashire

Groundworks firm wins infrastructure for 429-home Wain Homes scheme
7 days ago

Subcontractors wanted for jobs across the South West

Register now for latest Constructionline event in Bristol
7 days ago