Bowmer & Kirkland fined £280k for crane collapse

Grant Prior 13 years ago
Share

Main contractor Bowmer and Kirkland and structural engineer Bingham Davis have been found guilty of breaking safety laws following a crane collapse in Liverpool which left the driver paralysed.

Bowmer & Kirkland and Bingham had both denied the charges following the collapse in July 2009 when the tower crane toppled onto an apartment block at Chandlers Wharf in Liverpool city centre.

The court heard the crane fell onto a partially constructed apartment block, across a road and came to rest on the flats.

Eight counterweights on the crane, weighing a total of 56 tonnes, broke free and crashed through the roof and six floors of the building.

Crane driver Iain Gillham, 55, from Woolton, fell from his cab onto the roof of the apartments and through the hole created by the counterweights.

He suffered multiple injuries including a brain haemorrhage, fractured skull, broken right shoulder, broken ribs, crush injuries to his left side, and major spinal injuries which resulted in his legs being paralysed.

No one inside the building was injured but residents had to be evacuated from the 64 apartments, and some were rescued from their balconies.

The damage to the building was extensive and residents were unable to return to their homes for nearly two years while major reconstruction work took place.

The HSE investigation into the incident found that the crane’s foundation could not cope with the forces generated by the crane.

During the construction of the foundation, both Bowmer and Kirkland and Bingham Davis Ltd agreed to cut away essential steel reinforcement bars from the four concrete foundation piles, so that the crane’s feet could sit on top on them.

These were replaced with four steel rods in each pile.

Summing up in court, Judge Gilmour said he was satisfied that it was the removal of the reinforcing steel and the inadequate replacement of the steel rods that led to the foundation being unable to cope with the forces of the crane.

This subsequently lead to the foundation being overloaded and the crane collapsing.

Both companies were found guilty of breaches of the Health and Safety at Work Act

Bowmer and Kirkland was fined £280,000. A decision on prosecution costs will be made separately.

Bingham Davis has ceased trading since the crane collapse after going into voluntary liquidation. The company was fined a nominal £1,000.

Speaking after the hearing, the investigating inspector at HSE, Warren Pennington, said: “Serious failings on the parts of both Bowmer and Kirkland Ltd and Bingham Davis Ltd were uncovered by the Health and Safety Executive during an extensive and complex investigation into the crane collapse.

“Whilst it is bad enough that Iain Gillman will be unable to walk for the rest of his life as a result of the failings of both parties, it is no exaggeration to say it was only by pure chance that this catastrophic event did not result in multiple fatalities and significantly more damage to property.

“The circumstances leading to the collapse were a mess. Bingham Davis employees had no previous experience of designing the type of crane foundation used at Kings Dock Mill.

“Likewise, Bowmer & Kirkland’s employees at Kings Dock Mill had no experience of building one. Both parties made disastrous errors that were entirely preventable.

“The original error was made by Bingham Davis Ltd, which failed to spot a basic mistake in its calculations for the loadings imposed by the crane. This created a material risk which had the potential to have led to a crane foundation being constructed that was not strong enough to hold the crane up.

“During construction of the foundation, Bingham Davis advised Bowmer and Kirkland to cut away essential steel reinforcing bars in the foundation piles and replace such with steel rods.

“The removal of such reinforcing steel, resulted in the foundation being too weak to support the crane. The foundation was further weakened when Bowmer and Kirkland failed to ensure the adequate insertion of the replacement steel rods.

“Neither Company did enough to check what the result would be of cutting away this essential steel reinforcement and replacing such with steel rods.

“HSE hopes this case sends a clear message to the construction industry in relation to tower cranes foundations.

“Designers of such should be familiar with industry accepted guidance and follow it, unless they have extremely well thought-out reasons for not doing so.

“The role of the Principal Contractor is also crucial in managing the design process. Both Principal Contractors and Designers should ensure that robust systems for design checking are actioned at all times.

“We will continue to engage with the industry to ensure that lessons are learned.”

Latest news

Carey demolition cartel claim settled with developer

Legal action withdrawn after both sides agree settlement
23 hours ago

Strabag seals financial close for £3bn HARP project

Work to start next year on North West's Haweswater aqueduct upgrade
2 days ago

Civils winners revealed for £12bn National Grid high voltage work

Contractor wins complete £59bn investment programme
2 days ago

Watch giant HS2 bridge move complete ahead of schedule

Video highlights engineering feat in Birmingham
2 days ago

Lee Marley posts record revenue despite project delays

Brickwork contractor weathers hiatus in high-rise starts to deliver fifth year of growth
2 days ago

Latest contract winners in military living revamp

First phase sites allocated under new approach to Single Living Accommodation
2 days ago

Plans go in for £45m transformation of derelict site

Family homes proposed for brownfield land in Edgbaston
2 days ago

Cruden gets green light for Edinburgh housing job

Construction to start later this year to transform vacant 1950s building
2 days ago

United Living quits new-build housing as costs mount

£136m-turnover housing arm to wind down as focus shifts to core infrastructure
3 days ago

Fight looms for £3bn West Midlands building framework

Galliford Try, Morgan Sindall and others face fight to keep CWM seats
3 days ago

Industry anger over sudden CITB funding changes

Smaller contractors lose funding route worth £10,000 a year
3 days ago

Plans in to transform former GSK London HQ with 2,300 homes

Landmark 13-acre scheme set to transform Brentford Great West Road campus
3 days ago

Watch Murphy near completion of major new rail bridge

Latest video reveals progress on Greek Street bridge during 21-day train suspension
3 days ago

Mount Anvil’s in-house builder drives results in testing market

Group development pipeline holds steady at 3,384 homes despite dip in profit
3 days ago

Costain margin heads for 4.5% after half-year profit rise

Roads and HS2 rephasing hit transport revenues but £5.6bn forward book to support growth
4 days ago

Hinkley contractors face prosecution over rebar mesh fall

Bouygues and Laing O'Rourke face action brought by the Office for Nuclear Regulation
4 days ago

Farrans to build new £59m Paisley bridge

Work to start soon on transport project for Renfrewshire Council
4 days ago

Crown Estate hires Olympics village veteran to lead delivery push

John Nicholson to oversee £16bn portfolio’s major UK development pipeline.
4 days ago

Henry Boot gets green light for 2,500 new homes

Hallam Land division sees signs planning system is speeding-up
4 days ago

Wates inks £100m deal on first new-design prison houseblocks

HMP Onley expansion leads roll-out of new standardised design
5 days ago

£122m deal to unlock Newcastle’s last brownfield site

Land remediation funding paves way for 2,500-home Forth Yards neighbourhood
5 days ago

McLaren lands Heathrow logistics deal

1.6 hectare airport site to be transformed into modern warehouses
5 days ago

McAlpine veteran to lead T&T’s project management drive

Former Olympic Stadium lead Mike O’Donnell takes lead role with focus on major capital project delivery
5 days ago

IES snaps up Nexus Power out of administration

Utilities group strengthens expertise in 400kV jointing and offshore markets
5 days ago

Thames Water tenders £120m water main rehab deal

Company seeks 2–5 contractors for London and South East renewal works
5 days ago

Lower Thames Crossing to lead green planning reforms

New system to avoid another £100m HS2 bat tunnel
5 days ago

Mace lands latest 30-storey City of London tower

85 Gracechurch Street near Leadenhall Market to be transformed
6 days ago

Vinci gets go-ahead for £250m Stockport 8 scheme

Contractor to start first phase of 435 net zero homes next year
6 days ago

£80m bid race to convert Oxford Debenhams into labs

Crown Estate advance plan to convert former six storey department store
6 days ago

Bennett steps-in to finish Guinness Covent Garden brewery

Original fit-out contractor Beck Interiors fell into administration
6 days ago