Weston launches £45m robotic MMC factory

Aaron Morby 2 years ago
Share

British Offsite, the MMC specialist business owned by house builder Weston Group, has launched its £45m automated factory to produce light gauge steel panel systems for the industry.

Shaun Weston, MD of British Offsite, with father and chairman Bob Weston
Shaun Weston, MD of British Offsite, with father and chairman Bob Weston

The firm has invested in the new 137,000 sq ft Horizon factory in Braintree banking on the flexibility its system offers building designers over box-like volumetric designs.

Bob Weston, Chairman of British Offsite & Weston Group, said: “The launch of the ‘Horizon’ factory has created one of the most automated light guage steel panel assembly lines in Europe and the largest single production line in the UK.”

Robotic assembly line from Swedish supplier Randek

It has been fitted out with eight robots to create automated production lines capable of assisting with the delivery of up to 4,000 new homes per year.

Once the factory is fully operational, it would run a two-shift system five days a week, employing around 180 people.

The factory has been designed to be ultra flexible opening the scope of buildings it can supply from traditional housing to high-rise homes through to schools.

Horizon factory in Braintree

Initially, it will supply the group’s Weston Homes house building business, but it also has local and regional house builders in its sights as customers.

Shaun Weston, managing director of British Offsite and son of Bob Weston, said: “The new robotic production line at ‘Horizon’ allows for the consolidation of the work of up to five trades into one panel.

“Our MMC products are designed to be easily integrated into existing projects, helping to streamline traditional residential construction.”

The UniSystem is a specially developed hybrid MMC that is highly flexible and allows rapid integration into traditional building design.

The range that can be produced includes light gauge panels, walls, roofs and floors, with the panels having windows, doors, insulation, vents, fire stopping and external cladding in place.

In addition, British Offsite also manufactures internal fitout modules, under their BOS Fitout brand, which includes bathroom components, kitchen and bedroom products, designed to be easily integrated into existing projects, with full quality control testing before elements reach site.

 

Latest news

Cheetham Hill Construction sold to staff

Howard Chamberlain to step-back from MD role after nearly 60 years
16 hours ago

Buyers see sharpest fall in activity for five years

Grim July for construction as all sectors slump
20 hours ago

Cardiff to get 50-storey skyscraper in bold new tower plan

Developer ups height to 50 storeys for BTR landmark near Principality Stadium
23 hours ago

Bid race starts for Manchester £1.6bn light rail infrastructure work

Up to ten bidders wanted to compete for Metrolink work
23 hours ago

Competitive brick market sees Ibstock struggle to increase prices

Revenue rises but profits dip at materials giant
22 hours ago

Collins starts major London city fringe office retrofit

30 Finsbury Square refurb scheme will transform office block
23 hours ago

Civils boss banned over classic car sales

Director sold assets cheaply to sister company before folding
2 days ago

Ex-Kier director joins Stepnell to grow specialist units

Mike Smedley steps in as strategic director to lead growth push
22 hours ago

Clegg wins £80m Leeds office scheme

Eight-storey office project to rise on former Wellington Plaza site
2 days ago

Avant Homes takes £107m fire safety hit as losses mount

Builder led by Jeff Fairburn lifts provision by £39m for legacy cladding repairs
2 days ago

Profit recovery continues at Laing O’Rourke

CEO Cathal O’Rourke vows to "push the boundaries of what’s possible, in service of humanity"
3 days ago

Torsion clears Gateway 2 for Leeds student scheme

Firm to share lessons from the Gateway 2 process on Kirkstall Road 10-storey job
2 days ago

Bouygues chosen to build new children’s hospital

Construction to start within next 18 months on Cambridge site
2 days ago

Firms readied for £145m Welsh bridge race

Bidding to start this month for River Dee bridge replacement job
3 days ago

Cladding training boost to accelerate remediation work

Free courses for installers and supervisors to help accelerate post-Grenfell work
2 days ago

JRL replaces Ardmore on £150m City landmark revamp

Malaysian developer IJM calls in part-owned contractor for 25 Finsbury Circus job
3 days ago

Green light for Bristol Brabazon over-station office block

YTL to start eight-storey HQ building above new train station ticket office
3 days ago

£200m funding deal for hydrogen from waste plant

Tilbury site will be first stage of national network for green fuel
3 days ago

Go-ahead for London major hospital-to-resi scheme

Developer TT Group to deliver 140 homes and 65-bed care home on historic site
3 days ago

Civil specialist M Lambe slips into the red

Firm predicts bounce back this year as social housing recovers
3 days ago

Pickstock plans to revamp derelict Birmingham site

Developer looks to transform Soho Hill in the city
3 days ago

Retentions could be banned in late payment crackdown

Government considers abolition of hated system in construction
6 days ago

Heathrow Airport unveils £49bn ‘superhub’ expansion

Airport operator says it is ready to start design and supply chain activity this year
6 days ago

National Grid names contractors for £8bn of substation work

Regional deals will give firms first refusal on work in their area
6 days ago

Keltbray names Ferrovial’s Karl Goose as new CEO

New boss to take over in December as Vince Corrigan retires
6 days ago

Green light for first 880 homes at Manchester Mayfield

Four blocks rising to 28 storeys set to cost around £250m to build
6 days ago

Fit-out trade body hits back at bloated contracts

Dry walling and interiors body backs 500-word contract in fight against legal traps
6 days ago

Arora and Bechtel pitch rival Heathrow expansion plan

New Terminal 6 and runway said to be faster, greener and cheaper option
7 days ago

Major delays hit £4.8bn Levelling Up project programme

Whitehall admits most projects still stuck in design or planning phase
7 days ago

London new home starts slump 59% as safety regime bites

National rise masks capital’s fall amid BSR delays and social housing slowdown
7 days ago