Go-ahead for £1bn London Ram Brewery scheme

Aaron Morby 12 years ago
Share

Developer Minerva has finally got the go-ahead for a 1m sq ft mixed-use scheme at the Ram Brewery site in Wandsworth, London.

The developer had to scale-back plans and abandon designs for two residential towers after objections from English Heritage and the Health and Safety Executive.

Wandsworth planners have now approved the redrawn development plan, which will deliver 661 homes and  include a 113m tall, 36-storey landmark residential tower designed by EPR architects, and 100,000 sq.ft. of retail and restaurant accommodation.

ram_3_pop_up

The site’s historic buildings will be restored as a new micro-brewery and brewing museum.

It also includes significant works to the banks of the River Wandle which runs through the site to create 2.8 acres of public space.

Minerva has also agreed to pay around £16.5m in community infrastructure levy, which will go towards a redesign of the Wandsworth one-way-system.

View-along-the-Wandle-looking-South

Tim Garnham, Joint Chief Executive of Minerva, said: “As well as regenerating a significant area at the heart of Wandsworth town centre, the plans will act as a catalyst for further local investment including the Council’s plans to redesign of the gyratory which will see the majority of traffic removed from the town centre.”

home_one The derelict site in Wandsworth Town is situated on the banks of the river Wandle is home to the defunct Ram Brewery.

Latest news

Alun Griffiths set to rescue firm he sold for £36m

Tarmac to hand back Welsh civils contractor after five years of losses
45 minutes ago

Landsec to pump £2bn into new house building drive

Developer to build 6,000 homes as it sells offices to fund new schemes
51 minutes ago

Severfield to start steel on McAlpine car battery site

Specialist to start on £4bn site next month after steel package signed-off
1 hour ago

Construction Manager of the Year crowned

Jason Hunt of Willmott Dixon wins for work on Bristol concert hall
1 hour ago

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
22 hours ago

Vital Energi lands £250m Gatwick decarbonisation deal

Five-year programme to switch airport away from gas heating
1 hour ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
1 day ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
1 day ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
1 day ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
1 day ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
2 days ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
2 days ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
1 day ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
2 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
3 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
2 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
2 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
2 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
2 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
3 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
4 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
3 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
3 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
3 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
3 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
3 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
4 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
4 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
4 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
4 days ago

Contractor services