Digger bucket hits 20,000V electric cable

Grant Prior 11 years ago
Share

Two North East companies landed in court after a digger struck an underground cable during groundworks outside a factory in Hexham.

Newcastle Magistrates’ Court heard that the cable strike occurred on 19 March 2013 during work being undertaken for Campact Ltd – a subsidiary of products manufacturer Egger at its Hexham site.

The groundworks and civil engineering works were sub-contracted to Northern Construction Solutions Ltd.

On the day of the incident two workers, engaged on behalf of Northern Construction Solutions, were asked to excavate the area in front of a newly-built electric substation for the installation of drainage.

During the work the bucket of an excavator came into contact with a 20kV underground electric cable.

Both workers avoided injury, but it was a serious incident that sparked an HSE investigation.

Inspectors found that Egger was responsible for the provision of a services diagram that included the location of underground electric cables, and was also responsible for keeping it updated.

But the firm failed to update this diagram following the earlier construction of the substation and re-routing of the electric cables.

Consequently Northern Construction Solutions was not provided with up-to-date information regarding the location of the cables.

The court heard that although it was the duty of Egger to provide Northern Construction Solutions with appropriate information regarding the location of electric cables, the contractors equally had a duty to provide workers under their control with the information they needed.

Instead, they accepted the out-of-date services diagram, even though they knew there had been changes made in the area to be excavated.

Egger (UK) Ltd, of Hexham, Northumberland, was fined £8,000 and ordered to pay £578.90 costs after pleading guilty to a breach of the CDM regulations.

Northern Construction Solutions Ltd, of Chester le Street, Co Durham, was fined £4,000 and ordered to pay £761.60 costs after also pleading guilty to a CDM breach.

After the case, HSE Inspector Andrea Robbins said: “Fortunately nobody was hurt in this incident. However, the potential for serious, even fatal, injuries was foreseeable.

“Had both Egger and Northern Construction Solutions adequately planned and managed the risks arising from contact with live underground cables before the excavation work started, e.g. isolation of the services, provision of up-to-date and accurate information on the location of the underground services, then this incident would have most probably been avoided.

“The construction industry needs to be more aware of the dangers of working in the vicinity of live underground services.

“Appropriate planning and control measures should always be in place. A failure to do so could result in inadvertent contact with the live cables, the consequences of which can be fatal.”

Latest news

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
4 hours ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
3 hours ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
12 hours ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
11 hours ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
10 hours ago

Bowmer + Kirkland to build £190m Oxford science scheme

Work to start at end of next month on 180,000 sq ft Fabrica scheme
18 hours ago

New BAM leisure centre pool springs a leak

Contractor investigating "technical issues" delaying new £36m green leisure centre
2 days ago

United Living lands £250m HyNet pipeline deal

Firm wins deal to design and build over 34km of pipework to collect CO2
18 hours ago

Hydrogen diggers get green light to use roads

JCB hails historic decision for advance of hydrogen-fuelled plant on sites
19 hours ago

Go-ahead for McAleer & Rushe Glasgow student job

£100m funding deal paves way for 591-bed student tower
19 hours ago

Fly-tippers to get their vehicles crushed

Drones will be used to identify cowboy construction waste operators
19 hours ago

Green light for £150m West End office revamp

Shaftesbury Avenue office retrofit retains 75% of original building
2 days ago

Morgan Sindall lands £20m Brunswick Wharf scheme in Bideford

North Devon waterside project will provide 100 flats
1 day ago

Former Keltbray managers jailed after corruption trial

Jail sentences following bribery probe on jobs including Battersea Power Station
2 days ago

Lidl pumps £500m into store and logistics expansion

Discounter plans 40 new stores this year as expansion ramps up
2 days ago

JJ Rhatigan UK profit jumps as turnover tops £150m

Irish contractor's expansion in England gathers pace
2 days ago

Driverless digger to be used on Taylor Woodrow site

Autonomous excavator to work at Manchester Airport after successful trial
2 days ago

MCS Build lands Basingstoke warehouse scheme

Construction starts this month after £26m funding deal
2 days ago

Leeds United unveil stadium revamp design

Club has still to set a timeframe for staged Elland Road upgrade
2 days ago

Bowmer & Kirkland boosts margins as profits surge to £69m

Revenue nudges up towards £1.3bn in year of expansion
3 days ago

Offshore construction starts on £4bn windfarm

Foundations for first of 95 turbines installed: Watch video
3 days ago

AECOM buys civils consultant Allen Gordon

Global giant acquires Scottish water and energy specialist
3 days ago

Plans in for £1bn Northern Gateway site in Manchester

Plan for 500-acre manufacturing and logistic park advance
3 days ago

RED wins £31m London Shoreditch student digs job

Two extra floors will be added to Willen House scheme
3 days ago

Deconstruct handed £12m Grenfell demolition

Firm maintaining building awarded job without bid race to speed process
3 days ago

Sizewell site workers get made to measure PPE

Bespoke fitting service on offer at new Bryson branch
3 days ago

Comment: Gateway is acting like a barricade

Contractors left banging their heads on an (unbuilt) brick wall
6 days ago

Final phase of £1.5bn Elephant and Castle revamp hits planning

Get Living submits revised plan for 500 homes and 450-bed student block
7 days ago

Ealing backs final phase of £1.3bn estate rebuild

Friary Park estate rebuild in Acton reaches end stage
6 days ago

Green light for scaled-down Nottingham student tower

Glasshouse Street scheme will deliver 247 student rooms
6 days ago

Contractor services