HS2 Bill speeds through second reading

Aaron Morby 10 years ago
Share

The HS2 high speed rail project flew through its second reading with an overwhelming majority vote last night following a six hour debate.

The enabling bill to build the first phase will now go to committee stage after MPs threw out a proposal for the plan to be halted from Tory MP for Chesham and Amersham Cheryl Gillan .

MPs rejected her  proposal by 451 votes to 50, a majority of 401. Last June, 21 Conservative backbenchers opposed the government in a Commons vote laying the groundwork for HS2 and the size of the rebellion was expected to be larger on Monday night.

Tory dissenters are now clinging onto the hope that shadow chancellor Ed Balls will revive his resistance to the scheme by the general election, meaning it may never pass into law.

The government proposes to start construction in 2017, with the line between London and Birmingham due to be operational by 2026.

The bill provides:

  • the authority to undertake the works required for the construction and maintenance of Phase One of HS2
  • deemed planning permission for the railway
  • the power to compulsorily purchase land required for the Phase One route as well as for business relocation and regeneration
  • modification of existing legislative controls that are not designed for hybrid bills – this process is based on that used for HS1 and Crossrail
  • the ability to nominate a person or organisation to deliver Phase One on behalf of the Secretary of State

A separate bill will be brought in later by the government to allow the the second phase – north of Birmingham – to go ahead, with the aim of that part opening in 2033.

Latest news

Development firm fails hitting London building team for £2.6m

Luxury flats builder Ant Yapi was contracted to redevelop Westminster Tower site
18 hours ago

Government set to fund £1bn final HS2 London tunnel drive

Final tunnel drive to be taxpayer funded upfront with cash recouped later
17 hours ago

Amazon fires up Big-Box market with £500m job

Next generation triple floor super-shed to be built near Northampton
19 hours ago

Stricken road sweeper specialist rescued

Parts of hire specialist Go Plant bought out of administration by Sweeptech
18 hours ago

Costain highways lead joins Buro Happold

Paula Gough appointed to UK Development Director for Infrastructure
19 hours ago

G&H Group lands £20m+ M&E package from JJ Rhatigan

100-strong specialist team to start on West London site next week
18 hours ago

Bidding open for £800m professional services deal

Procure Partnerships encourages SMEs to bid with 9 regional lots
18 hours ago

Construction buyers see fastest growth for 14 months

Commercial building work leads the way in April
2 days ago

Go Modular Technologies files administration notice

Southampton bespoke volumetric specialist employs around 60 staff
2 days ago

Cladding firm went down owing supply chain £7.7m

Debts revealed at Everton stadium cladding contractor Alucraft Systems Ltd
2 days ago

Rydon dogged by legacy fire safety remediation costs

£19m spent on fire safety remediation work to date
2 days ago

Carpenter killed by falling timber frame panels

Court fines specialist contractor £8,000 after site tragedy
6 days ago

Trio of builders win King’s Award for sustainability

Henry Brothers, Willmott Dixon and ZED Pods recognised for sustainability
2 days ago

Kent police seize huge haul of stolen site tools

Hunt for power drill fitted with tracker busts tool theft ring
2 days ago

Robertson names new Northern construction chiefs

Ian Phillips promoted and Ricky Brown joins from Morgan Sindall
2 days ago

Road sweeper specialist files administration notice

Go Plant lodges court notice
6 days ago

Anglian Homes rides in to finish crashed Everest contracts

Rival doubled glazed window specialist commits to complete orders
6 days ago

Final work starts to connect super sewer to London system

End in sight with 1.5m thick concrete wall to be demolished to link-up to Lee Tunnel sewer system
6 days ago

Legal challenge launched against £1.5bn A66 dualling

Balfour Beatty, Kier and Keltbray must now await outcome of court challenge
6 days ago

John F Hunt wins 24-storey Battersea tower

Specialist to carry-out demolition, enabling works and RC frame construction
7 days ago

William Hare wins steelwork on £500m Broadgate towers

Specialist to work on 2 Finsbury Avenue with McAlpine
7 days ago

McAlpine appoints MD to grow ventures business

Owain Thomas will build on private rental and healthcare development successes
6 days ago

BAM Co-op Live Arena opening delayed yet again

Another gig cancelled last night amid last minute safety concerns
7 days ago

National Grid unveils winners for £9bn network upgrade

New 'enterprise model' to deliver infrastructure schemes quicker and cheaper
1 week ago

Turkish insulation panel maker to build £45m UK factory

Assan Panel to open first UK plant at Freeport East
7 days ago

Expanding consultant Stantec swoops for Hydrock

Stantec UK business expands by a third as 950 staff join from Bristol-based engineer
1 week ago

Contractors wanted for £800m highways deal

Bids invited for Eastern Highways Alliance Framework 4
7 days ago

Galliford Try names group head of infrastructure

David Lowery promoted to Divisional Managing Director – Infrastructure.
7 days ago

Chigwell Group looks at stock market listing

Essex contractor registers as Public Limited Company
1 week ago

A57 Mottram Bypass clears final legal challenge

Balfour Beatty to get go-ahead to start shortly
1 week ago

Contractor services