Nottingham lab fire probe turns to working practices

Aaron Morby 11 years ago
Share

Safety experts are now investigating whether the blaze that destroyed Nottingham University’s chemistry lab was caused by “unsafe working practices on the construction site”.

Police and fire services investigators have been on the site for over a week, using dogs trained to sniff out whether accelerants were used at the building site.

Notts Police said: “We have concluded our examination of the site, which is now subject to the Health and Safety Executive, but our investigation continues into establishing the cause of the fire.”

The HSE said it was now looking into the cause of the fire at the £20m timber-framed building, which was being built by Morgan Sindall and was at the fit-out stage.

Sixty fire fighters and 10 engines battled to bring the fierce blaze under control, when the alarm was raised earlier this month.

But the building was quickly engulfed and completely destroyed.

The project was part funded by GlaxoSmithKlein and was billed to be the world’s first zero carbon chemistry laboratory.

An HSE spokesperson told the Nottingham Post: “The HSE is working with police and fire services to investigate the cause of the fire at the Nottingham University campus.

“HSE’s involvement will be to establish whether the fire was caused by unsafe working practices on a construction site, and to consider adequacy of the fire precautions in place.”

A spokesperson for Morgan Sindall said: “The Health and Safety Executive are undertaking a routine, statutory role in investigating the recent fire at The University of Nottingham.

“The cause of the fire remains under investigation and no cause has been ruled in or out at this stage. We remain committed to assisting the investigation into the fire in whatever way we can.”

Latest news

Alun Griffiths set to rescue firm he sold for £36m

Tarmac to hand back Welsh civils contractor after five years of losses
1 day ago

Landsec to pump £2bn into new house building drive

Developer to build 6,000 homes as it sells offices to fund new schemes
1 day ago

Severfield to start steel on McAlpine car battery site

Specialist to start on £4bn site next month after steel package signed-off
1 day ago

Construction Manager of the Year crowned

Jason Hunt of Willmott Dixon wins for work on Bristol concert hall
1 day ago

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
2 days ago

Vital Energi lands £250m Gatwick decarbonisation deal

Five-year programme to switch airport away from gas heating
1 day ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
2 days ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
2 days ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
2 days ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
2 days ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
3 days ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
3 days ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
2 days ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
3 days ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
4 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
3 days ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
3 days ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
3 days ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
3 days ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
4 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
5 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
4 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
4 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
4 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
4 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
4 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
5 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
5 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
5 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
5 days ago

Contractor services