Driver shocked as crane hits power line

Grant Prior 10 years ago
Share

A crane operator suffered an electric shock while moving steel sections at a new rugby clubhouse site.

Subcontractor Lee Burge 38, who lives near Bristol, was using the crane to move sections of steel at Trowbridge Rugby Club on 20 March 2013, where a new clubhouse and play area were being built by Ashford Homes (South Western) Ltd.

Swindon Crown Court heard that as Burge started to lift a section of steel using the crane, the hook block came into contact with an 11kV power line and he suffered an electric shock.

Burge was resuscitated but now suffers from long term memory loss.

An HSE investigation established that Ashford Homes had been warned by the electricity company about the presence of overhead power cables, and had received advice on the removal of the power supplies running across the site.

But no measures were put in place by the company to prevent plant and equipment accessing the area beneath the power lines or for the power supply to be diverted or isolated.

Ashford Homes (South Western) Ltd of Merlin Way, Melksham, was fined £20,000 and ordered to pay costs of £5,159 after pleading guilty to breaching safety regulations.

Speaking after sentencing HSE inspector Ian Whittles, said: “Work near overhead power lines should be carefully planned and managed so that risks from contact or close proximity to the lines are adequately controlled.

“Ashford Homes failed to do this, and had been operating a range of machinery capable of coming close to the lines before Mr Burge was seriously injured.

“Luckily Mr Burge was resuscitated, but he now suffers from life changing complications due the electric shock he received.

“He was extremely close to losing his life and this is down to the failure of the construction company to adopt a safe system of work.

“This terrible incident could have been avoided had the company placed physical barriers on site so that no plant or equipment could gain access to either side and directly below the overhead power lines, or if the hive voltage cables were diverted or isolated.”

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
16 hours ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
20 hours ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
2 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
21 hours ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
21 hours ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
22 hours ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
21 hours ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
2 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
22 hours ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
2 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
3 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
2 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
2 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
2 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
2 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
2 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
3 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
3 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
3 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
3 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
4 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
3 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
3 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
4 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
4 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
4 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
4 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
4 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
4 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services