Bidding set to start on £2bn East London cultural quarter

Aaron Morby 9 years ago
Share

The London Legacy Development Corporation is preparing to fire the starting gun in the next few months on several big bid races for the proposed cultural and education district development at Queen Elizabeth Olympic Park.

Buildings proposed for the waterfront site
Buildings proposed for the waterfront site

The huge scheme will be broken up into five major design and build contracts covering a new V&A for east London, a 600-seat theatre for Sadler’s Wells and London College of Fashion complex on one site and a major new campus for University College London on another.

Under present plans building work is due to start on both the UCL East and Stratford Waterfront sites in 2018 with building openings planned in 2020/21.

Construction costs on the Waterfront site containing the new V&A, Sadlers Wells and London College of Fashion are estimated at £850m alone, while UCL plans to spend £1.25bn on its East campus and refurbishing parts of its central London Bloomsbury campus.

The design of Stratford Waterfront is the work of a team of renowned architects, designers and master planners led by Allies and Morrison, including RIBA Royal Gold Medal winners O’Donnell and Tuomey, and Arquitecturia.

Site one: Stratford Waterfront

Stratford Waterfront

1.London College of Fashion (University of the Arts London)

A 15-storey building with podium over 350,000 sq ft containing five lecture rooms, gallery, workshops and studio space. It is presently envisaged that the shell and core will be procured by the LLDC with fit-out being procured separately by UAL.

2.The Victoria and Albert Museum (East)

A 7-storey building set over 200,000 sq ft with ceiling heights of up to 6m in the galleries. The shell and core and circulation and back of house fit-out area will be procured by the LLDC with the gallery fit-out being procured separately by the V&A.

3.Sadler’s Wells and Museum 2

A 5-storey theatre building set over 80,000 sq ft comprising 550-seat auditorium and six dance studios. The museum building will hold three floors of gallery space and two floors of accommodation. The shell and core and circulation and back of house fit-out area will be procured by the LLDC with the gallery fit-out is being procured separately by others.

Site two: UCL East

ucl-stratford-campus-olympicopolis-x160516

4.UCL East: Marshgate Development

Marshgate development consists of an 8-10 storey building set over 360,000 sq ft containing major academic facilities. Construction of shell and core and public realm will be procured and delivered by LLDC. It is presently envisaged that the fit-out will be the responsibility of UCL and procured separately.

5. UCL East: Pool Street Development

Pool Street development consists of two buildings rising to 17 and 14 storeys above a two storey podium. This will contain student and staff accommodation providing 400 bed space and 45,000 sq ft of academic space. All work will be procured by UCL.

For more information visit the Delta eSourcing portal.

 

Latest news

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
6 hours ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
8 hours ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
9 hours ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
13 hours ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
12 hours ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
13 hours ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
5 hours ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
12 hours ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
3 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
3 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
4 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
3 days ago

Kier wins £58m East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
4 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
4 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
4 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
4 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
4 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
4 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
6 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
5 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
5 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
5 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
5 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
5 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
5 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
6 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
5 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
6 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
6 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
6 days ago

Contractor services