Solar shading specialist starts making Covid-19 face shields

Grant Prior 5 years ago
Share

Solar shading specialist Solinear is switching some of its production line in York to helping manufacture protective face shields during the Covid-19 crisis.

One of the firm’s welders suggested switching some of its 3D printers to helping manufacture PPE urgently needed by the NHS.

Welder Elliot Headley said: In the current situation, Solinear’s 3D printers could be better applied to the production of face shields.

“Having seen the news and understanding the gravity of the situation it made sense to me – switch from production of regular Solinear items to face shields, if we can.”

The 3D printers usually produce ancillary components for Solinear’s architectural louvres and solar shading products.

Now they are manufacturing plastic clamps for face shields for as long as the crisis continues while production of Solinear’s usual range continues while adhering to strict government directives.

In another example of the industry rallying to help, CLD Fencing Systems has launched the Covid-19 Rapid Response Physical Security Team

The team is made up of key physical perimeter security advisors from CLD and members of the Approved Contractor Scheme (ACS) around the UK who are able to provide front line services such as the NHS, HM Armed Forces and supply depots with rapid foundation free fencing to protect staff, supplies and equipment.

Russell Wells, Global Sales Director at CLD Fencing Systems said: “We are already supporting key projects in the UK for the Armed Forces and NHS.

“However, we wanted to see how we could take this one stage further. That is why we spoke with our extensive Approved Contractors located across the length and breadth of the UK to see what we could do together.”

The team operates a 24/7 policy, where any front-line service can contact CLD for support. A trained physical perimeter security advisor will discuss the requirements and challenges of the site, from temporary hospitals to forward supply depots.

They will then formulate a package and arrange with members of the ACS network to supply and install the fencing and gate solutions.

Stewart Plant, Director of Marketing at CLD Fencing Systems, said: “With the NHS facing it’s biggest crisis outside of war time we are seeing opportunist attacks for PPE and medical supplies on a national scale.

“By taking the pressures of arranging and sourcing physical security from the NHS and Military we allow them to concentrate on saving lives whilst our teams and network work on keeping them safe and secure.”

A dedicated webpage has been set up for the service here or call 24hrs on Freephone number 0800 074 2861

Latest news

Tide gets go-ahead for over 1,000-home London scheme

Volumetric expert gains planning for co-living homes scheme in Southwark
7 hours ago

Construction output flickers into life in March

First quarter activity flatlines after slow start to year
10 hours ago

Skanska lifts margin to 4.3% as profit hits £78m

Infrastructure and FM drive near-tripling of profits
19 hours ago

Mayor backs 46-storey student tower at Canary Wharf

City Hall overturns Tower Hamlets council rejection of 912-bed scheme
18 hours ago

Plans go in for 100 acre Port of Tilbury expansion

Construction could start next year on site the size of 70 football pitches
9 hours ago

Inland Homes creditors face £38m hit

Administrator confirms no cash for supply chain
1 day ago

Durkan dogged by legacy jobs despite return to trading profit

Durkan scales down new homes contracting to focus on retrofit work
24 hours ago

Munnelly founder hands over CEO role to son

Paul David Munnelly steps up to CEO as father becomes chairman
10 hours ago

Barking build to rent towers face rebuild

Major remedial work needed on resi scheme built by Shapoorji Pallonji UK Ltd
1 day ago

London new home starts plunge 38% as Building Safety Act bites

Capital only region to see Q1 fall in NHBC new home registrations
2 days ago

Sureserve swoops for rival compliance outfit Kinovo in £56m deal

Recommended cash offer will take AIM listed contractor private
1 day ago

Crown Golf tees up £1bn plan to build 3,000 homes on course land

Major housing plan for spare land on eight UK courses
1 day ago

Green light for Peterborough Station Quarter £48m revamp

First phase to start before the end of the year
1 day ago

Morgan Sindall starts £38m Caerphilly leisure hub

New swimming pool and health suite forms part of town regeneration plan
1 day ago

145 firms win places on £800m building safety framework

Fusion21 confirms latest winners: Full list
2 days ago

Higgins Homes and site workers face manslaughter charges

Contractor and four site staff charged after woman killed by falling pallet of bricks
3 days ago

Operator spots cracked mast on Hinkley tower crane

Hinkley Point C contractor hit with safety notice over failed mast pin and cracks
2 days ago

Countdown starts for £1bn Birmingham highways bid race

Council will break-up mega framework into five lots
2 days ago

Acciona wins £400m Thames waterworks upgrade

Lea Valley Coppermills water treatment works to get full overhaul
2 days ago

Pension giants pledge £25bn for infrastructure push

Seventeen pension providers pledge to invest in projects
2 days ago

Safety row over London tower ducking fire regs by 30cm

Fire union calls on Mayor to block Bromley flats plan over single staircase
2 days ago

Midgard lands £145m deal to build Edition Birmingham

Construction to start shortly on twin residential towers
3 days ago

McAleer & Rushe set to break £500m turnover barrier

Pre-tax profit jumped 16% to £46m last year
3 days ago

Top design team picked for £2.5bn York Central scheme

Massive city centre regen scheme moves to detailed design
3 days ago

MoD to bid £100m command HQ enabling works

Hertfordshire joint forces command centre expansion advances
3 days ago

Failed shed specialist Marbank owed suppliers £10m

Contractor was facing a string of adjudication claims
3 days ago

New scaffolding training trade body launches

Scaffolding Training Alliance formed amid disquiet caused by planned training changes
3 days ago

£1.8bn framework planned for green retrofit drive

Procure Plus to invite bids later this month
3 days ago

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5-mile TBM drive in 652 days
6 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
6 days ago

Contractor services