Vinci Building buys tower cranes for first time

Grant Prior 8 months ago
Share

VINCI Building has bought its own tower cranes for the first time at the Sheffield Forgemasters’ Brightside Lane site.

The contractor usually hires its cranes but has decided to invest in the all-electric technology from WOLFFKRAN of Germany.

The two WOLFF 355 Bs are the first wholly owned by VINCI Building and cost around £2.5m on the £138m project at Sheffield Forgemasters to build a 13,800 sq m building to house the UK’s largest open-die forging facility for the MoD-owned company.

The cranes will be used to construct the press pit foundations – a key element in the works – a 40-metre-high superstructure, erect gantries, chimneys and redistribute materials. The second WOLFF 355 B will be on site in the middle of 2025, and both will be working until early 2026.

Chris Winspear, VINCI Building regional director, said: “These cranes are a first for us – we own them outright and the arrival and set up of the first WOLFF 355 B is a major landmark for Sheffield Forgemasters and particularly for us at VINCI Building.

“It marks an investment in the project and our business. We are optimistic for 2025 and this all-electric crane proves our intent to deliver on major schemes of benefit for the UK economy and to do it in as sustainable a manner as possible. We are grateful to the WOLFFKRAN team for all their assistance in the specification and delivering it to our team.”

Adrian Hawkins, WOLFFKRAN Ltd. Sales Director, said: “We are incredibly proud and privileged to be VINCI Building’s chosen supplier. Witnessing the cranes being erected in Sheffield, is a special moment for us. Both WOLFF 355 B tower cranes will receive comprehensive service and maintenance from WOLFFKRAN under our maintenance agreement for many years to come.

“We eagerly anticipate collaborating closely with VINCI Building on the Sheffield Forgemasters project and future endeavours where these cranes will play a vital role.”

Latest news

Quarterly construction output growth masks orders slide

New orders down by over 8% driven by fall in infrastructure and offices
58 minutes ago

Vinci UK swings back into profit after group restructure

£166m cash injected to strengthen building and facilities operations balance sheets
21 hours ago

Staged procurement to make comeback as pricing risk bites

Developers turn to staged deals to control costs on big-ticket commercial jobs
2 hours ago

McGee profit halves as project start delays hit

Revenue up 24% but profits fall on higher carry costs
1 hour ago

Vistry to deliver 2,300 homes at Rugeley power station site

139-acre brownfield site has already been extensively remediated
1 hour ago

Andrew Scott wins role on Swansea’s next big office build

Contractor appointed for detailed design of 800-desk city centre hub.
2 hours ago

Knights Brown to start £29m Poole flood wall job

1.5km barrier to protect homes and unlock regeneration plans
2 hours ago

Kier lands £16m first ECI job with Southern Water

Design deal covers nitrogen cut and UV upgrade at Hampshire wastewater sites
21 hours ago

Watkin Jones seals deal on 200-bed student scheme

Bristol project will involve four brick buildings rising to seven storeys
21 hours ago

Severfield brings in new CEO from Laing O’Rourke ranks

Everton Stadium job chief Paul McNerney to take the helm in the autumn
1 day ago

Balfour hits 3% construction margin target

Profit target finally reached after eight years
1 day ago

Network Rail launches £240m OLE steelworks framework race

Deal to supply overhead line equipment for electrification schemes
1 day ago

Briefing starts for £8bn highways maintenance shake-up

National Highways launches early talks on next-generation regional roads upkeep
1 day ago

Plant hirer Lynch launches labour supply division

Workers now available to Tier 1 and Tier 2 infrastructure contractors
1 day ago

Kori lands latest £17m care home contract

Work to start on site in south west London next month
2 days ago

£70m Bristol student job finally gets Gateway 2 approval

Student developer Unite to progress two big schemes
2 days ago

Government unveils 10 new construction technical colleges

£100m plan to train 40,000 skilled trades by 2029 gets off the ground
2 days ago

McLaren lands London School of Economics £100m revamp

Central London job will be largest Passivhaus retrofit building in the UK
2 days ago

Industry standards body parts company with chairman

Considerate Constructors Scheme executive chairman also leaves role at Lighthouse Charity
2 days ago

Clegg wins car park to flats conversion contract

Work to start this autumn on transforming multi-storey car park into flats
3 days ago

Go-ahead for major retrofit of former London De Beers office

Mace advised on pre-planning construction plan for Hatton Garden gateway scheme
2 days ago

Danny Sullivan HS2 workers hit-out over agency moves

Site workers unhappy about how TUPE transfers are being handled
3 days ago

Overbury set for major law firm fit-out win

Contractor tipped for 2 Aldermanbury Square win
6 days ago

M&E contractor Cannock goes under

Supply chain takes hit as Staffordshire specialist goes down owing £4m
3 days ago

HS2 mega bridge span to showcase heavy-lift innovation

Rare mix of heavy-lift techniques needed for 1,631-tonne Birmingham bridge span
3 days ago

Modular specialist Kingston files administration notice

Court papers filed by £12m turnover Hull based business
3 days ago

OHOB wins enabling works for £150m Medway regen scheme

Strood Civic riverside to provide nearly 200 homes on former council HQ site
3 days ago

China told to lift veil on ‘greyed-out’ London super embassy plans

Ministers give China two weeks to justify redactions in blueprints for £255m Royal Mint Court scheme
6 days ago

Mace wins £1.1bn British Library extension

Work to start on site next year after construction manager contract awarded
7 days ago

Spencer wins £29m Waterbeach rail station job

VolkerFitzpatrick drops out despite early contractor involvement
7 days ago