Motorists caught on film driving through roadworks

Grant Prior 7 years ago
Share

Road workers are facing nearly 300 incidents a week of abuse and dangerous driving by motorists.

Research by Highways England has revealed a catalogue of serious incidents and near misses ranging from motorists driving into coned off areas to physical and verbal abuse.

Of almost 3500 incidents recorded between July 2017 until September 2017, 150 were serious, leading to four road workers and two motorists being injured.

Highways England is now calling on road users to be patient if they are delayed by roadworks and to respect road workers doing a difficult job.

The video below shows the unacceptable behaviours that workers are faced with every day.

In it, a driver has been stopped at the site of road works on the A120 in Essex involving two barriers in place for drivers to be allowed through with an escort.

The irresponsible driver had already driven around the initial closure point on the wrong side of the road, then drove at speed to attempt to avoid Essex Police who were supporting Highways England in enforcing the closure.

His actions jeopardised the lives of all those road workers on this stretch of road between Braintree and the A12 at Marks Tey.

Another incident captured on video shows a lorry driving through coned off roadworks on the M1.

Adie Whiting, 33, a married father of three from Doncaster, has worked for Interserve on behalf of Highways England as a traffic control safety officer, deploying cones, signs, barriers and temporary traffic signals.

He said: “I’ve been sworn at a lot, physically threatened on occasions and even had someone try to run me over once.

“You have to have a thick skin doing this job.”

Road worker abuse often occurs during incursions, whereby drivers seek to ignore a road closure to drive through instead, often failing to heed advance warning signs of upcoming closures.

Highways England is reminding motorists of their responsibility while driving through roadworks, with these four key messages:

  • respect our road workers – slow down near road works and obey speed limits and signs.
  • just because workers aren’t visible, it doesn’t mean they are not present. This is especially true when operations take place at night, but also applies when visibility is restricted by works vehicles and equipment.
  • we plan maintenance and improvement projects to allow works to proceed in the safest and most cost-effective way, with minimum disruption to road users.
  • think what it would be like if you had to contend with lorries and cars driving through your place of work.

Latest news

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
19 hours ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
21 hours ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
21 hours ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
21 hours ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
2 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
21 hours ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
22 hours ago

Early call-out for Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
21 hours ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
2 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
2 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
2 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
2 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
2 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
2 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
6 days ago

1,650 former ISG staff launch legal claims

Redundancy Payment Service facing payout of more than £9m
7 days ago

Plans lodged for £1bn cancer research centre in Sutton

London Cancer Hub will deliver around 1m sq ft of lab and research space
6 days ago

London Met Uni seeks firm for £284m estate revamp

Contractor wanted to deliver capital works and FM
6 days ago

Delayed £2bn estate rebuild back on as Berkeley signs deal

Birmingham council development agreement paves way for 2028 Ladywood start
7 days ago

Tilbury Douglas boosts margin to 2.1% as profits double

Firm targets 3.5% margin by 2029 under new business plan
7 days ago

Subbies battle for fastest bricklayer title

Winchmore management team go back on the tools
7 days ago

Green light for revised McLaren Reading revamp

Mixed-use plans to transform Broad Street Mall site
6 days ago

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
1 week ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
1 week ago

Unite signs £390m student beds JV with Manchester Met

Construction at Cambridge Halls site to start next year
7 days ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
1 week ago

Kitchen fitter crushed to death by concrete blocks

House builder goes into liquidation before court case
7 days ago

Mears clinches £230m renewal for key Milton Keynes housing deal

Housing upkeep contractor achieves 100% renewal rate in bust rebid period
7 days ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
1 week ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
1 week ago

Contractor services