Gary Neville £200m Manchester tower gets the final nod

Aaron Morby 7 years ago
Share

Gary Neville and Ryan Giggs’ £200m St Michael’s skyscraper scheme in Manchester has got the full green light.

The consortium of investors supporting the footballers-turned-developers has been told the scheme will not be called in by the Secretary of State upholding earlier city council full planning approval.

Jackson’s Row Developments is the client for the St Michael’s project to be built near the Grade I-listed Manchester Town Hall.

Located in Deansgate, the St Michael’s scheme will consist of a landmark tower and stepped extended podium building designed by architect Hodder and Partners.

This replaces architect Make’s previous twin tower plan, which was dropped in the face of complaints that it would destroy historic buildings at the site.

As a result the Sir Ralph Abercromby pub and the frontage of the Bootle Street Police Station will now be preserved within the scheme.

The top of the tower will house a single penthouse split over two levels with terrace at each end

Including a large podium building the tower will rise to 39 storeys and contain a five star, 200-bed hotel with nearly 190 luxury flats above.

Office building forms part of the podium for the main tower

There will also be 148,000 sq ft of offices in a 9-storey stepped building forming part of the podium to the east of the main tower. This will include rooftop bars with stunning outdoor rooftop terrace.

Chinese construction group BCEGI is an active equity and construction partner in St Michael’s, owing a 21% stake.

At present there is no time table for enabling works and construction, which will employ nearly 300 throughout the build.

Neville said:   “We are delighted that the Secretary of State has decided to not call in our revised plans for St Michael’s and that the vision for this landmark mixed-use scheme will be realised.

“It’s been more than a decade since the idea to regenerate a strategic city centre location was first considered – and our whole team is very pleased that we can focus on delivering this project for Manchester, bringing new high-quality development that will enhance the city’s position both nationally and internationally.”

Project Team

  • Project Manager: Zerum
  • Cost Consultant: Turner and Townsend
  • Architect: Hodder + Partners
  • Structural Engineer: WSP
  • MEP Engineer: Zerum

Latest news

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
18 hours ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
21 hours ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
20 hours ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
21 hours ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
1 day ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
20 hours ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
21 hours ago

Early call-out for Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
21 hours ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
2 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
2 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
2 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
2 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
2 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
2 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
6 days ago

1,650 former ISG staff launch legal claims

Redundancy Payment Service facing payout of more than £9m
7 days ago

Plans lodged for £1bn cancer research centre in Sutton

London Cancer Hub will deliver around 1m sq ft of lab and research space
6 days ago

London Met Uni seeks firm for £284m estate revamp

Contractor wanted to deliver capital works and FM
6 days ago

Delayed £2bn estate rebuild back on as Berkeley signs deal

Birmingham council development agreement paves way for 2028 Ladywood start
7 days ago

Tilbury Douglas boosts margin to 2.1% as profits double

Firm targets 3.5% margin by 2029 under new business plan
7 days ago

Subbies battle for fastest bricklayer title

Winchmore management team go back on the tools
7 days ago

Green light for revised McLaren Reading revamp

Mixed-use plans to transform Broad Street Mall site
6 days ago

Three arrested in Blu-3 and Mace bribery probe

Serious fraud office swoops over alleged £3m bribes to former Mace associates
1 week ago

Scotland’s most complex A9 dualling job heads to market

Market testing starts for £205m Pitlochry to Killiecrankie 6.4km upgrade
1 week ago

Unite signs £390m student beds JV with Manchester Met

Construction at Cambridge Halls site to start next year
7 days ago

Turkish contractor Limak to build new Luton Town stadium

Construction to start this summer on 25,000-seater venue
1 week ago

Kitchen fitter crushed to death by concrete blocks

House builder goes into liquidation before court case
7 days ago

Mears clinches £230m renewal for key Milton Keynes housing deal

Housing upkeep contractor achieves 100% renewal rate in bust rebid period
7 days ago

Murphy on board at new £32m rail station

Construction to start next year at Golborne station
1 week ago

HS2 engineers finish UK’s heaviest bridge slide early

A46 Kenilworth Bypass reopens 30 hours earlier than planned
1 week ago

Contractor services