MPs slam smart motorway plans to lose hard shoulders

Grant Prior 9 years ago
Share

The Transport Select Committee has slammed latest smart motorway plans to use hard shoulders as live lanes.

The “all lane running” plan is an extension of existing schemes where the the hard shoulder is used at peak times or to deal with congestion.

The Committee said that the permanent loss of the hard shoulder in all lane running schemes was a “radical change and an unacceptable price to pay for such improvements.”

Committee chair Louise Ellman said: “The permanent removal of the hard shoulder is a dramatic change.

“All kinds of drivers, including the emergency services, are genuinely concerned about the risk this presents.

“It is undeniable that we need to find ways of dealing with traffic growth on the strategic network.

“But All Lane Running does not appear to us to be the safe, incremental change the Department wants us to think it is.

“While ‘smart motorways’ have existed for years, this is fundamentally different.

“Government needs to demonstrate that All Lane Running schemes do not make the road any less safe that the traditional motorway with a hard shoulder.

“The Government has a model which has worked. The scheme on the M42 has a track record of safety and performance but subsequent versions have gradually lowered the standard specification.

“The most recent incarnations of All Lane Running have less provision for safety measures than original pilot schemes.

“Government needs to demonstrate considerable improvement in this area, including more emergency refuge areas, driver education and enforcement, before the Committee will endorse the extension of a scheme which risks putting motorists in harm’s way.”

Plans are in place to permanently convert the hard shoulder into a running lane on around 300 miles of motorway.

Highways England has a programme of 30 all lane running schemes worth £6bn over the next nine years.

Industry experts disagree with the MPs.

Simon Benfield, Team Director: Bridges South, at consultant Ramboll said: “The hard shoulder on motorways represents a perception of safety that is greater than the reality.

“All that separates the hard shoulder from 70mph traffic is a white line. Despite projecting a sense of safety, over 1,500 people are killed or injured every year on the hard shoulder.

“Research indicates that in the large majority of cases, where there is no hard shoulder available, drivers are able to push on and reach the nearest lay-by as has been seen on the trunk road network for many years.

“The psychological impact of having a hard shoulder available is that drivers are more likely to use it when they actually don’t need to.

“In addition to this, there has been an overall reduction in collisions where Smart Motorways operate with hard shoulder running in effect, either temporarily or permanently due to the effects of greater control.

“By adopting Smart Motorways over traditional widening it is possible to provide improvements in many more areas around the network thus providing a positive improvement for many more people.

“When compared to the physical widening of motorways, Smart Motorways are 20-40% more cost effective and therefore applying a level-headed approach to the opening of hard shoulders is a sensible way forward.”

Latest news

Breakthrough for HS2 as first Birmingham tunnel section dug

Balfour Beatty VINCI completes 3.5km TBM drive in 652 days drive
2 days ago

HS2 Curzon Street station redesign approved as timber roof axed

Change to meet stricter fire safety rules and cut maintenance costs
2 days ago

Care home fire trial collapses

Prosecution withdrawn against four firms including Morgan Sindall Property Services
3 days ago

Leicester rebids £22m station revamp after failed tender race

Council opts for ECI route after receiving one bid for project
2 days ago

Kier wins East Coast College rebuild job in Great Yarmouth

Work to start this summer for 1,300-student college
2 days ago

R G Carter wins £28m hospital car park job in King’s Lynn

MSCP paves way for £1.5bn Queen Elizabeth Hospital rebuild in 2027
2 days ago

London to relax green belt building rules

Sadiq Khan shifts position on planning
2 days ago

Willmott Dixon wins Great Yarmouth waterfront deal

North Quay 10.5 acres mixed-use scheme to advance
3 days ago

SIG chief quits to join Travis Perkins

Gavin Slark to leave by the end of this year
2 days ago

Eight take key spots on £250m Prosper framework

Housing and public building upkeep deal for North East awarded
3 days ago

Early call-out for £150m Ebbsfleet Garden City infrastructure

Bidders day to set out plan for Ebbsfleet Central commercial scheme
4 days ago

McLaren storms April contracts league with flurry of wins

Cardiff Bay Arena job headlines a series of big contract wins
3 days ago

Balfour Beatty lifts cash forecast after strong first quarter

Contractor set to hit £1bn average monthly net cash in 2025
3 days ago

Goldman Sachs-owned Adler & Allan buys 180-strong civils outfit

West Country's Glanville Environmental gets new owner
3 days ago

Caddick lands first contract for £200m Skelmersdale revamp

Developer gets green light for masterplan
3 days ago

Van Elle sells HGV fleet to haulage firm

WS Specialist Logistics pays £2.9m to take on fleet and drivers
3 days ago

Buyers more bullish about prospects for year ahead

Residential "resilient" but commercial work a weak spot
4 days ago

Council backs first Brutalist car park-to-flats scheme

Newcastle-under-Lyme multi-storey car park to be reborn as pioneering homes scheme
4 days ago

Hinkley Point C hits peak build with 26,000 jobs

3,000 more workers to join as fit-out work ramps up
4 days ago

Over 40 firms win Wessex Water M&E minor works deal

Broad sweep of specialists picked for AMP8 programme
4 days ago

Spencer lands Scottish bridge hat-trick

Steelwork, gantries and bearing upgrades on Kessock, Forth and Tay crossings
5 days ago

Winners revealed for £1.5bn decarbonisation deal

Fusion21 confirms places for 40 firms: Full list
4 days ago

Cladding firm fined £225,000 after fatal fall

Court hears how cherry picker didn't reach all parts of repair job
4 days ago

Completed buildings caught-up in Gateway 2 chaos

Developer distraught after dealing with Building Safety Regulator
5 days ago

Aviva submits plans for 34-storey City office tower

Subject to planning work to start in autumn 2027
5 days ago

Murphy takes 40% stake in Aussie civils contractor

Firm enters Australasian market with stake in Sydney-based contractor Abergeldie
6 days ago

Moat seeks firm for £420m repairs and maintenance deal

15-year deal to upkeep 20,000 south east homes
5 days ago

Lynch takes over hotel for Sizewell plant operators

Hire giant now in the hotel business to guarantee accommodation for workers
5 days ago

Subcontractors wanted across Scotland

Latest Constructionline event in Glasgow: Register now
5 days ago

Six guilty of £2m bribery over Devon housing site deals

Corrupt building bosses and E.ON project chief and QS sentenced
1 week ago

Contractor services