Pollution eating tiles used on Scottish homes

Grant Prior 13 years ago
Share

Pollution eating tiles have been used on new roofs in Scotland which can absorb the same amount of nitrous oxide as that emitted by the average car over 100,000 miles

Fife Council Building Services has trialled the innovative tiles on seven semi detached houses in Kinglassie.

Almost 1,000 Marley Eternit EcoLogic tiles were provided for the project through builders merchant Jewson, who helped advise the council on the best sustainable roof tile to meet their requirements.

The EcoLogic tiles absorb and neutralise harmful nitrous oxides (NOx) in the atmosphere and during its lifetime an average sized roof using EcoLogic tiles could remove an amount of NOx equivalent to that emitted by a modern car driving 100,000 miles.

Steve Anderson, Contracts Manager for Fife Council Building Services, said: “One of our strategic priorities is to become the best green council in Scotland so the environmental rating of building materials we use on our housing projects is very important.”

Drew Fleming, general manager at Jewson in Kirkcaldy, added: “Fife Council indicated that they wanted a sustainable roof tile that was A+ rated in the BRE Green Guide to Specification.

“So we immediately identified the EcoLogic tile as the best one for the project and worked with Marley Eternit to demonstrate the tile to Fife Council, showing them how the tile could achieve the high environmental standards they required while at the same time reducing pollution.”

The pilot project in Kinglassie is the first step in Fife Council’s investment programme to bring all of its housing stock up to the Scottish Quality Housing Standard.

The ambitious programme, which will refurbish thousands of homes, is due to be completed by 2015.

Ecologic Tiles have a special external coating which contains grades of titanium dioxide (TiO2).

This surface coating triggers a reaction under the influence of UV radiation in sunlight which converts harmful asthma-causing pollutant nitrogen oxides (NOx) into nitric acid ions.

These are then neutralised by the lime and calcium carbonate in the concrete, so removing the potentially harmful pollutants from the atmosphere.

Latest news

Anglian Homes rides in to finish crashed Everest contracts

Rival doubled glazed window specialist commits to complete orders
30 mins ago

Road sweeper specialist files administration notice

Go Plant lodges court notice
15 mins ago

Final work starts to connect super sewer to London system

End in sight with 1.5m thick concrete wall to be demolished to link-up to Lee Tunnel sewer system
4 mins ago

Legal challenge launched against £1.5bn A66 dualling

Balfour Beatty, Kier and Keltbray must now await outcome of court challenge
21 mins ago

John F Hunt wins 24-storey Battersea tower

Specialist to carry-out demolition, enabling works and RC frame construction
20 hours ago

William Hare wins steelwork on £500m Broadgate towers

Specialist to work on 2 Finsbury Avenue with McAlpine
21 hours ago

McAlpine appoints MD to grow ventures business

Owain Thomas will build on private rental and healthcare development successes
18 hours ago

BAM Co-op Live Arena opening delayed yet again

Another gig cancelled last night amid last minute safety concerns
24 hours ago

National Grid unveils winners for £9bn network upgrade

New 'enterprise model' to deliver infrastructure schemes quicker and cheaper
2 days ago

Turkish insulation panel maker to build £45m UK factory

Assan Panel to open first UK plant at Freeport East
1 day ago

Expanding consultant Stantec swoops for Hydrock

Stantec UK business expands by a third as 950 staff join from Bristol-based engineer
2 days ago

Contractors wanted for £800m highways deal

Bids invited for Eastern Highways Alliance Framework 4
24 hours ago

Galliford Try names group head of infrastructure

David Lowery promoted to Divisional Managing Director – Infrastructure.
1 day ago

Chigwell Group looks at stock market listing

Essex contractor registers as Public Limited Company
2 days ago

A57 Mottram Bypass clears final legal challenge

Balfour Beatty to get go-ahead to start shortly
2 days ago

100 jobs axed as Geoffrey Osborne confirms administration

Chairman Andrew Osborne calls it a 'sad day' as board loses fight for survival
3 days ago

Midgard set for Notting Hill office tower overhaul

Landmark project edges towards final approval after 10-year planning saga
2 days ago

Cumbrian civils firm clinches £40m Sellafield contract

Civils specialist Stobbarts will support McAlpine on groundworks and concrete
2 days ago

Designers named for London 2000-bed student rooms job

Bouygues will build £400m London School of Economics student scheme next to Tate Modern
2 days ago

£117m-turnover contractor files administration notice

ARJ Construction lodges court notice
3 days ago

£1bn London Blackfriars tower blocks approved

Trio of buildings rising to 45, 40 and 22 storeys approved by Southwark Council
3 days ago

Council decides to end Balfour deal after 13 years

Contractor has been maintaining roads across Herefordshire since 2013
3 days ago

Six civils clients to switch to low carbon concrete and steel

National Highways, Northumbrian Water and Sellafield sign fresh decarbonising pledge
4 days ago

Fortem extends homes repair deal across Birmingham

Willmott Dixon owned firm adds another two years to deal worth £170m
3 days ago

Kier wins £118m civil service Darlington hub

Work is expected to start towards the end of this year
4 days ago

Green light for 34-storey Digbeth apartments tower

480 flats will be delivered for Clarion housing association
3 days ago

LHC starts race for major retrofit and decarb framework

Hunt starts for firms to help with 6.1m social homes upgrade target
4 days ago

Windows giant Everest crashes into administration

Around 350 jobs at risk while hunt starts for a buyer to salvage business
4 days ago

Green light for £500m Newcastle health complex

Mixed use scheme will promote healthy living across all stages of life
4 days ago

Olympian Homes gets go-ahead for Bristol’s tallest building

Work on student and co-living towers to start this summer
4 days ago

Contractor services