Go-ahead for London office tower on stilts

Aaron Morby 2 weeks ago
Share

Developer CIT has been given approval to build a major office scheme in London on stilts to allow trees and open public space to run beneath the building.

The Foster's designed building floats above an extensive new public park that includes squares and flexible spaces
The Foster's designed building floats above an extensive new public park that includes squares and flexible spaces

The design by architect Foster for a 518,000 sq ft building has been split into four elements and raised by up to 18m above ground level on big steel columns and braces.

Known as Colechurch House, the office-led, mixed-use scheme will stand in the shadow of the Shard near London Bridge Station and will also provide a theatre, shops, restaurant, bar, and gym.

Following planning approval, work is expected to start on site early next year.

A contractor has not yet been named although Mace has been acting as construction consultant for CIT during planning, which is acting as development manager on the project.

The ultra sustainable project replaces a tired 1960s office block with a striking stepped profile scheme, rising to 22 storeys at its highest point.

A highly-optimised façade will significantly reduce energy consumption, supported by mixed-mode ventilation, ground source energy piles and extensive photovoltaic panels.

The scheme targets: carbon dioxide savings of 55% relative to standard UK building stock, and an Outstanding BREEAM and Platinum Well standard rating.

The development ‘floats’ above an extensive new public park

Below the park will be a brand new multi-storey venue for Southwark Playhouse.

In addition, a new lightweight footbridge will connect London Bridge Station to the site on Duke Street Hill, replacing the current brutalist bridge and London Bridge Walk.

Steve Riddell, Partner and Head of Development at CIT, said: “Designed collaboratively and prioritising social and environmental wellbeing, the net zero development will also provide far reaching benefits for Southwark through the new theatre space, public park and significant employment creation.

“Following extensive community consultation, the addition of the new lightweight footbridge to our plans will create vastly improved commuter access.”

The project reinforces CIT’s longstanding commitment to the area. Earlier this year it received permission to develop a major new medical and life sciences scheme on the Vinegar Yard site just a short walk away from Colechurch House.

Designed by architects Kohn Pedersen Fox Associates in close collaboration with Guy’s & St Thomas’ NHS Foundation Trust and King’s College London, it will be one of the first buildings within the BioMedical Hub on the London Bridge Campus and part of SC1, London’s new Life Science District.

Latest news

Construction arm drives Mace to record profit

Revenue expected to top £2bn this year despite project delays
34 mins ago

Sisk fixes price on £227m Quintain flats job

Quintain signs single-largest contract so far at Wembley Park
43 mins ago

Rising costs tip William Hare to £3.6m loss

Specialist contractor falls into the red despite near 60% revenue rise to £220m
22 hours ago

Safety blitz on “aches, pains and strains” on site

1,000 site visits planned in coming months to check how workers are moving heavy or bulky materials
23 hours ago

Drones sent flying underground to check sewers

Traditional inspection teams replaced with latest technology
4 hours ago

Plan submitted for 470 Preston flats scheme

Stoneygate Central scheme on Dryden Mill site will rise to 16 storeys
4 hours ago

Graham starts £124m M25 Junction 28

Work on the 36-month Junction 28 upgrade includes constructing a major two-lane loop road
3 hours ago

Keltbray bags brace of energy infrastructure wins

Civils work on huge converter stations worth £30m to specialist
21 hours ago

Balfour Beatty sole winner for £4bn Scape civils deals

Contractor reappointed to England, Wales and Northern Ireland and separate Scottish deals
1 day ago

PR expert Baroness Rock to chair Costain

Kate Rock will take up senior board role at the end of the year
1 day ago

Billington profit upgrade after strong first-half

Steelwork contractor says weaker pound will allow it to reignite its old export markets in Europe
1 day ago

Green light for £120m Liverpool “super restaurant”

Historic Pumphouse at Stanley Dock to be transformed
2 days ago

Tolent bags £15m Sunderland skills academy

Work to start later this year on Housing Innovation and Construction Skills Academy
1 day ago

Government launches net zero review

Pro-growth and pro-business review of net zero 2050 target launches
2 days ago

L&G Modular wins 400-home Wolverhampton job

Modular specialist wins 17-acre Canalside South regeneration scheme
2 days ago

£1.2bn A12 upgrade accepted for planning

15-mile Essex road upgrade between Chelmsford and Colchester aims for 2023/24 start
2 days ago

US consultant trumps WSP bid for RPS Group

Tetra Tech swoops but WSP could come back with new offer if bidding war breaks out
2 days ago

Sisk hands staff £900 cost of living cash boost

Firm also promises staff £400 Christmas voucher in November
2 days ago

Loathed IR35 reforms scrapped by Chancellor

Contractors will no longer have to determine tax status of freelance workers
5 days ago

Higgins signs deal for 740 West London homes

Work to start this autumn on two Hayes housing estate rebuilds
2 days ago

Kier wins Sefton net zero £36m school job

Deyes High School in Maghull will consist of 60 classrooms
2 days ago

Giant TBM cutterhead takes road trip to second drive

Balfour Beatty Vinci to drag remaining TBM back through tunnel for second bore
5 days ago

Fast-track 138-project growth plan – full list

Chancellor banks on road projects to lead growth plan recover
5 days ago

Kwarteng backs construction to lead “new era for Britain”

Planning rules to be ripped-up to speed infrastructure work as 38 new Investment Zones created
6 days ago

Green light for next two Manchester NOMA jobs

Work to start early next year on first of two major office buildings
5 days ago

Bouygues struggles to raise profitability

Loss-making contracts dent pre-tax profit at £835,000 from revenue up at £484m
5 days ago

Architect helps staff with £1,000 cost of living cash

P+HS Architects to make one-off payments this autumn
5 days ago

Sisk wins £69m rerouting of landslip-prone A59

Site clearance to start next month at Kex Gill in Yorkshire
6 days ago

Renewal race starts for £800m NEPO framework

Nearly 20 firms face fight to renew places on north east construction panel
5 days ago

Avonside supply chain left holding £17m in unpaid bills

Former bosses revealed as buyers of branches from administrators
6 days ago

Contractor services